Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table: 14.1.12-1 Page:
1 of 1 UNIT 2 TIME SEQUENCE OF EVENTS Accident Event Time (sec)
Loss of Offsite Power to the Station Auxiliaries AC power is lost 10.0 Main feedwater flow stops 10.0 Low-low steam generator water level trip signal initiated 56.0 Rods begin to fall into core 58.0 Reactor coolant pumps begin to coastdown 58.0 Two Motor-Driven Auxiliary Feedwater Pumps Start and Supply the Steam Generators 117.0 Cold Auxiliary Feedwater is Delivered to the Steam Generators 534.0 Core decay heat decreases to auxiliary feedwater heat removal capacity
~800.0 Peak water level in pressurizer occurs 1406.0