7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1.9-1, Time Sequence of Events, Page 1 of 1
ML16343B038
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343B038 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

16.1 Table: 14.1.9-1 Page:

1 of 1 UNIT 2 TIME SEQUENCE OF EVENTS Accident Event Time (sec)

Loss of Normal Feedwater Main feedwater flow stops 10.0 Low-low steam generator water level trip signal initiated 55.7 Rods begin to fall into core 57.7 Two Motor-Driven Auxiliary Feedwater Pumps Start and Supply the Steam Generators 115.7 Cold Auxiliary Feedwater is Delivered to the Steam Generators 515.0 Peak water level in pressurizer occurs 4672 Core decay heat plus RCP heat decreases to auxiliary feedwater heat removal capacity 4800