ML16343A985

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1.11B-1, Time Sequence of Events (Full V-5 Core), Page 1 of 1
ML16343A985
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A985 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

16.1 Table:14.1.11B-1 Page:

1 of 1 UNIT 2 TIME SEQUENCE OF EVENTS (FULL V-5 CORE)

Accident Event Time (sec)

Excessive Load Increase

1. Manual reactor control (Min fdbk) 10% step load increase 0.0 Equilibrium conditions reached 160.0
2. Manual reactor control (Max fdbk) 10% step load increase 0.0 Equilibrium conditions reached 40.0
3. Automatic reactor control (Min fdbk) 10% step load increase 0.0 Equilibrium conditions reached 160.0
4. Automatic reactor control (Max fdbk) 10% step load increase 0.0 Equilibrium conditions reached 70.0