ML16343A769

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.3.9-20, Strainer Minimum Submergence Determination
ML16343A769
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A769 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

22 Table: 14.3.9-20 Page:

1 of 1 UNIT 1 STRAINER MINIMUM SUBMERGENCE DETERMINATION Break Size Containment Water Level at Initiation of Recirculation, ft Minimum Water Level During Recirculation, ft Time from Event Initiation until Minimum Water Level, ~ hours Minimum Submergence Main Strainer, ft Minimum Submergence Remote Strainer, ft DEGB 7.7 5.9 9.1 0.9 1.3 DGBS1 6.9 5.6 2.5 0.6 1.0 SBLOCA (2 in) 6.8 5.1 9.5 0.1 0.5 1 This break was analyzed as occurring in the reactor cavity at the reactor vessel nozzle, resulting in 30% of the break flow going to the reactor cavity and 70% going to the loop compartment.