ML16343A769
| ML16343A769 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16343A769 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
22 Table: 14.3.9-20 Page:
1 of 1 UNIT 1 STRAINER MINIMUM SUBMERGENCE DETERMINATION Break Size Containment Water Level at Initiation of Recirculation, ft Minimum Water Level During Recirculation, ft Time from Event Initiation until Minimum Water Level, ~ hours Minimum Submergence Main Strainer, ft Minimum Submergence Remote Strainer, ft DEGB 7.7 5.9 9.1 0.9 1.3 DGBS1 6.9 5.6 2.5 0.6 1.0 SBLOCA (2 in) 6.8 5.1 9.5 0.1 0.5 1 This break was analyzed as occurring in the reactor cavity at the reactor vessel nozzle, resulting in 30% of the break flow going to the reactor cavity and 70% going to the loop compartment.