ML16343A620
Jump to navigation
Jump to search
| ML16343A620 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16343A620 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table: 14.3.4-11 Page:
1 of 1 LOWER COMPARTMENT TEMPERATURE TRANSIENT CALCULATION RESULTS Time Of Containment*
Case Maximum LC Temp OF Time Tmax Sec.
Spray Fan 0.6 ft2 326.1 151.39 53.
605.
0.35 ft2 325.8 322.8 59.
617.
0.1 ft2 320.7 651.
106.
663.
- Hi-2 Pressure Setpoint used was 3.5 psig.
Relay time used for spray actuation after Hi-2 signal was 45 sec.
Relay time used for fan actuation after Hi-2 signal was 600 sec.