7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.3-4-11, Lower Compartment Temperature Transient Calculation Results
ML16343A620
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A620 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

16.1 Table: 14.3.4-11 Page:

1 of 1 LOWER COMPARTMENT TEMPERATURE TRANSIENT CALCULATION RESULTS Time Of Containment*

Case Maximum LC Temp OF Time Tmax Sec.

Spray Fan 0.6 ft2 326.1 151.39 53.

605.

0.35 ft2 325.8 322.8 59.

617.

0.1 ft2 320.7 651.

106.

663.

  • Hi-2 Pressure Setpoint used was 3.5 psig.

Relay time used for spray actuation after Hi-2 signal was 45 sec.

Relay time used for fan actuation after Hi-2 signal was 600 sec.