ML16343A475
| ML16343A475 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/10/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ruegr G PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9702180259 | |
| Download: ML16343A475 (6) | |
Text
gp 8 "ECy~
Wp I I "( I o
+*~4+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYANPLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 Gregory M. Rueger, Seni or Vice Presi dent and General Manager Nuclear Power Generation Business Unit Pacific Gas and Electric Company Nuclear Power Generation, 814A 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177
SUBJECT:
GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION
Dear Mr. Rueger:
The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 9, 1997.
The GFES will consist of 100 questions.
The maximum time allowed to complete the examination is 2-1/2 hours and the passing score will be 80 percent.
In order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing Branch.
The letter must be received both in the Region and at NRC Headquarters by March 6, 1997, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration.
The letter must certify that the candidates will have completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license.
The letter must also list the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent.
A sample registration letter is enclosed.
The address for the Operator Licensing Branch Chief is as follows:
Stuart A. Richards, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission MS OWFN 9-D-24 Washington, DC 20555 Approximately 2 weeks prior to the examination administration date, your designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)
9702f 80259 9702f 0 PDR ADGCK 05000275 V
PDR Sincerely,
~
Thomas P.
Gwynn, Director Division of Reactor Safety
Pacific Gas and Electric Company 2
Dockets:
50-275 50-323 Licenses:
DPR-80 DPR-82
Enclosure:
As stated cc w/enclosure:
John Griffin, Nuclear Training Director Pacific Gas and Electric Company P.O.
Box 56 Avila Beach, CA 93424
~
~
Paci fic Gas and El ectr i c Company bcc to DCB (IE42) bcc distribution by RIV:
DRP Branch Chief Resident Inspector S.
Leah Tremper, OC/DAF/LFARB (TWFN 9-E-10)
RIV file L. Miller, TTC L. J. Callan, RA L. A. Hurley, GFES file DOCUMENT NAME:
GFES1 To nxehe copy of document, Indicate in boa M ~ Copy without enclosures 'V Copy with enciosures 'l4 ~ No copy RIV:OB:LA N
C:OB D:DRS LAHurle 02/l /97
/"
JLPellet TP n
02/ Q/97 02/ Ip/97 OFFICIAL RECORD COPY
/
/97