~pg Racy
~C
~o cu 1
UNITEDSTATES CLEAR REGULATORY COMMISSIO REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 AR LINGTON. TEXAS 76011 8064 APR -3 '%C Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN:
Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
DIABLO CANYON On March 11,
- 1996, the NRC staff completed the semiannual PPR of Diablo Canyon.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection resources.
The PPR for Diablo Canyon involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period September 15,
- 1995, to March 11, 1996.
PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the PPR review.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 8 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
We will inform you of any changes to the inspection plan.
If you have any questions, please contact Howard Wong at 510/975-0296.
Sincerely, J.
E.
yer, Director Division of Reactor Projects Dockets:
50-275 50-323
'censes:
DPR-80 DPR-82
Enclosure:
Inspection Plan 9604080i6f 960403 PDR ADQCK 05000275 8
Pacific Gas and Electric Company CC:
Sierra Club California ATTN:
Dr. Richard Ferguson Energy Chair 1100 11th Street, Suite 311 Sacramento, California 95814 San Luis Obispo Mothers for Peace ATTN:
Ms. Nancy Culver P.O.
Box 164 Pismo Beach, California 93448 Ms'acquelyn C. Wheeler P.O.
Box 164 Pismo Beach, California 93448 The County Telegram Tribune ATTN:
Managing Editor 1321 Johnson Avenue P.O.
Box 112 San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors ATTN:
Chairman Room 370 County Government Center San Luis Obispo, California 93408 California Public Utilities Commission ATTN:
Mr. Truman Burns~Mr. Robert Kinosian 505 Van Ness, Rm.
4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee Attn:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN:
Mr. Steve Hsu P.O.
Box 942732 Sacramento, California 94234
Pacific Gas and Electric Company State of California ATTN:
Nr. Peter H.
Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101 Pacific Gas and Electric Company ATTN:
Christopher J.
- Warner, Esq.
P.O.
Box 7442 San Francisco, California 94120 Pacific Gas and Electric Company Diablo Canyon Power Plant ATTN:
Warren H. Fujimoto, Vice President and Plant Manager P.O.
Box 56 Avila Beach, California 93424
Pacific Gas and Electric Company APR -3 lg96 bcc to DMB ( IEOI) bcc distrib.
by RIV:
L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector DRS-PSB MIS System RIV File M.
Hammond (PAO, WCFO)
DOCUMENT NAME:
G: ~tDRPDIRiSPPRiLTR96. DC To receive copy ol dccNnent, indicate in bere "C
~ Copy without enclosures "E" ~ Copy with enclosures "N" ~ No copy RIV:DRP/E GWJohnston
/
/96 C:DRP/E HJWong 3/
/96 t D:DRP JEDyer
/3 /96 0
C CO CO
Pacific Gas and Electric Company APR -3 Ig6 bcc to DMB (IEOl) bcc distrib.
by RIV:
L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
Resident Inspector DRS-PSB MIS System RIV Fil e M.
Hammond (PAO, WCFO)
Te receive copy cf doctanent, indicate In bcx: "C" ~ Copy wrthout enclosures E
~ Copy with enclosures "ff" ~ No copy DOCUMENT NAME:
G: iDRPD IRtI,SPPRiLTR96. DC RIV:DRP/E GWJohnston
/
/96 C:DRP/E
~
f~i HJWon,,io, 3/
/96
:DRP JEDyer
/3 /96
DIABLO CANYON INSPECTION PLAN IP Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION P 40501 IP 84750 IP 71001 IP 83750 IP 84750 IP 40500 IP 81700 IP 82301 IP 82301 TITLE/
PROGRAM AREA Monitor Licensee Self-Assessment of EATS Environmental Monitoring Licensed Operator Requalification Program Evaluation Occupational Radiation Exposure Chemistry Safety Assessment equality Verification Physical Security Program Evaluation of EP Exercise EP Exercise NUMBER OF INSPECTORS 10 PLANNED INSPECTION DATES 4/8 4/12/96 4/15 4/19/96 5/20 5/24/96 6/3 6/7/96 6/3 - 6/7/96 6/3 6/7/96 6/24 6/28/96 6/10 - 6/14/96 10/7 10/11/96 10/9/96 TYPE OF INSPECTION COMMENTS Regional Initiative in Lieu of Engineering Team Inspection (IP 37550)
(2nd Week of 2-Week Inspection)
Core Core Core Core Core Core Core NRC Site Team Participation in the EP Full Participation Exercise