7 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1-8 - ECCS Injection to Recirculation Switchover Model for Containment Response Analysis Time and RWST Delivered Volume After Rwst
ML16343A198
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A198 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

17 Table:

14.1-8 Page:

1 of 1 UNIT 1 ECCS INJECTION TO RECIRCULATION SWITCHOVER MODEL FOR THE CONTAINMENT RESPONSE ANALYSIS TIME AND RWST DELIVERED VOLUME AFTER RWST EARLIEST SWITCHOVER SETPOINT IS REACHED EVENT TIME AFTER SWITCHOVER SETPOINT IS REACHED (sec)

RWST DELIVERED VOLUME (gal)

Earliest switchover setpoint is reached 0

280,000 Stop RHR / CTS pumps 0

280,000 Start RHR / CTS pumps 300 285,975 CCP and SI suction realignment to RHR discharge (minimum RWST delivered) 1707 314,000