ML16343A193
| ML16343A193 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16343A193 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
18.2 Table:
14.1-4 Page:
1 of 1 INSTRUMENTATION DRIFT AND CALORIMETRIC ERRORS POWER RANGE NEUTRON FLUX SETPOINT AND ERROR ALLOWANCES:
(% of rated power)
ESTIMATED INSTRUMENTATION ERRORS: (% of rated power)
Nominal Setpoint 109 Calorimetric Error 21 0.31 Axial power distribution effects on total ion chamber current 5
3 Instrumentation channel drift and setpoint reproducibility 2
1.0 Maximum overpower reactor trip point assuming all individual errors are simultaneously in the most adverse direction 119 1 MUR power uprate uses reduced calorimetric error allowance. The sum of the change in Rated Thermal Power defined in the Technical Specifications and the MUR reduced calorimetric error allowance is equal to, or less than, the original +2% value supported by the safety analyses.