INDIANA AND MICHIGAN POWER D. C. COOK NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Revision: 25.0 Table: 14.3.2-1 Sheet:
1 of 2 Unit 1 Last Revised: Revision 25.0 Plant Input Parameters for Small Break Loss-of-Coolant Accident Core Rated Thermal Power-100% (MWt) 3304 Peak Linear Power, kW/ft 15.171 Fuel Type 15x15 Upgrade Fuel Total Core Peaking Factor, FQ 2.32 Hot Channel Enthalpy Rise Factor, FH 1.55 Hot Assembly Average Power Factor, PHA 1.38 Thermal Design Flow, gpm/loop 83,200 Nominal Vessel Average Temperature, °F 577.4(1)
Nominal Pressurizer Pressure, psia 2250(2)
Pressurizer Pressure Uncertainty (psia)
+/-67 Minimum Auxiliary Feedwater Flow Rate, lbm/s per SG 14.68 Steam Generator Tube Plugging (Maximum), %
10 Initial Accumulator Water Volume, ft3 946 Accumulator Tank Volume, ft3/tank 1350 Accumulator Water Temperature, °F 130 Minimum Accumulator Cover Gas Pressure (minus uncertainties), psia 600 Refueling Water Storage Tank Temperature, °F 105 Nominal Steam Pressure, psia 848.32
INDIANA AND MICHIGAN POWER D. C. COOK NUCLEAR PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Revision: 25.0 Table: 14.3.2-1 Sheet:
2 of 2 Unit 1 Last Revised: Revision 25.0 Plant Input Parameters for Small Break Loss-of-Coolant Accident SI Flow Delay Time, seconds 54 HHSI Cross-Tie Valve Position Open (Injection & Cold Leg Recirculation)(3)
RHR Cross-Tie Valve Position Open (Injection)
Closed (Cold Leg Recirculation)
(1) Analysis supports operation over the range of nominal full-power Tavg values of 553.7°F - 575.4°F.
(2) Analysis supports operation at nominal initial pressurizer pressure (without uncertainties) of 2100 psia and 2250 psia.
(3) Conservatively modeled HHSI cross-tie valves closed in injection phase.