ML16343A027
Jump to navigation
Jump to search
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:
11.2-5 Page:
1 of 1 ORIGINAL REFUELING SHIELD DESIGN PARAMETERS 1 Total number of fuel assemblies 193 Minimum full power exposure 1000 days Minimum time between shutdown and fuel handling 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Maximum exposure rate adjacent to spent fuel pit 1.0 mrem/hr Maximum exposure rate at water surface 2.5 mrem/hr 1 These parameters are kept for historical reasons. The dose rates are no longer applicable since the design of the spent fuel pit has been changed.