September 2,
1998 Mr. Gregory M. Rueger PaciTic Qas an~A Electric Company NPG - Mail Code A10D P. O. Box 770000 San Francisco, California 94177
SUBJECT:
REQUEST FOR ADDITIONALINFORMATIONREGARDING SIMULATOR CERTIFICATION REPORT FOR DIABLOCANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS. MA3401 AND MA3402)
Dear Mr. Rueger:
The NRC staff is currently reviewing your "Simulator CertiTication Report" dated December 8, 1997.
In order to complete our review of your report, the NRC staff requires additional information as described in the enclosure.
Please provide your response within 60 days from the date of this letter.
Ifyou have any questions regarding this matter, please contact me at (301) 415-1313.
Sincerely, Original Signed By Docket Nos. 50-275 and 50-323
Enclosure:
Request for Additional Information ccw/encl: See next page ACRS HWong, RIVWCFO PGwynn, RIV RGallo Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation 0
Docket PUBLIC PDIV-2 Reading EAdensam WBateman SBloom EPeyton OGC DOCUMENT NAME: DCA3401.rai OFC NAME DATE PDIV-2/PM SBloo
/ Q/98 PDIV-2<LA
~ey o 8/
/98 OFFICIAL RECORD COPY 980903033'L 980902 PDR ADOCK 05000275 P
0 0
I
~t
Mr. Greqory M..Rueger September 2,
1998 cc w/encl:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Christopher J. Warner, Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Mr. Robert P. Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. O. Box 56 Avila Beach, California 93424 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, California 93940
4
E UE F
R D
T L IN R
AT I
ULAT R
CIF ND E
B CANY N
UNI 0KE N
ONF GU T
1.
What CM procedures are used?
2.
How is CM integrated with software development?
0 D
ONT 3.
4.
5.
How many simulator software loads exist simutaneously?
How is the training load related to the training program?
Does the simulator support the use controlled reference unit procedures?
UETS 6.
The test report indicates that over 700 SCRs originated in the 4 year test program.
Please provide a topic summary of SCRs that are currently open.
7.
How are SCRs prioritized for disposition?
8.
How are open SCRs reflected in lesson plan development and/or differences training?
D E
9.
Please provide a sample copy of QTP test results for a design basis LOCA transient performance test performed during the current cycle.
AJOR F C 10.
Please provide a sample copy ofthe modification test reports for the SPDS upgrade and the computer upgrades.
0 r
(
e
~ ~"