Forwards Insp Repts 50-275/98-09 & 50-323/98-09 on 980505-07 & Subsequent NRC Staff Inoffice Reviews Through 980721 & Nov.None of Mods or Procedure Revs Resulted in Increase in Probabilistic Risk of Plant
ML16342E228
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/19/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342E229 List:
References
50-275-98-09, 50-275-98-9, 50-323-98-09, 50-323-98-9, A-98-364, NUDOCS 9808240236
Download: ML16342E228 (12)


See also: IR 05000275/1998009

Text

CATEGORY 2

'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

c>'CCESSION NBR:9808240236

DOC.DATE: 98/08/19

NOTARIZED: NO

DOCKET ¹

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

~

~

~

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

OWELL,A.T.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts 50-275/98-09

'& 50-323/98-09

on

980505-0721

&. notice of violation.Insp reviewed four

'potential unreviewed safety questions

associated

w/component

cooling water, auxiliary saltwater

& residual heat removal.

DISTRIBUTION CODE: IEOIF

COPIES

RECEIVED:LTR

ENCL $

SIZE: 5+X~

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

C

REC1PIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

NRR/DRPM/PECB

NUDOCS-ABSTRA'CT

OGC/HDS3

ERNAL: LITCO'RYCE,J

H

NRC PDR

\\

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1'

1

1

1

1

1

1

1.

1

1

1

1

1

1

1

1

1

0

C

QQ Q A;

wi pg Ogg

~

ae <<ir )

K

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTZON LISTS

OR REDUCE THF NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

r

~gg REMI

Wp0

Cy

o

+~*~+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE. SUITE 400

ARLINGTON.TEXAS 76011.6064

August 19, 1998

j

A 98-364

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B14A

77 Beale Street, Room 1451

P.O, Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT 50-275/98-09; 50-323/98-09 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

An onsite special inspection was conducted from May 5-7, 1998, to review four potential

unreviewed safety questions associated with component cooling water, auxiliary saltwater and

residual heat removal system modifications and procedure revisions for your Diablo Canyon

Nuclear Power Plant, Units 1 and 2, reactor facilities. Additional NRC staff review of these

issues was conducted through July 21, 1998. The enclosed report presents the scope and

results of that inspection.

A telephone exit was conducted with Mr. Womack and other

members of your staff regarding these issues on July 21, 1998.

The NRC noted that the 10 CFR 50.59 program was not effectively utilized in these cases to

determine whether a proposed design or procedural change represented

a potential unreviewed

safety question or affected the technical specifications.

Design and procedural changes utilized

the 10 CFR 50.59 process as a means of validating design and procedural changes, but did not

correctly provide a licensing basis determination.

The NRC staff did find that the modifications

implemented and procedure revisions were initiated to correct conditions which had resulted in

degraded system conditions or could have resulted in potential operation outside the design

basis.

None of the modifications or procedure revisions resulted in an increase in the

probabilistic risk to the plant.

Two violations are cited in the enclosed Notice of, Violation (Notice) and the circumstances

surrounding these violations are described in detail in the enclosed report. These violations are

of concern because

the regulatory aspects of design and procedure changes were not

appropriately addressed

in the licensing design basis reviews to determine if an unreviewed

safety question was involved or whether the technical specifications were impacted.

Please

note that you are required to respond to this letter and should followthe instructions specified in

the enclosed Notice when preparing your response.

The NRC will use your response,

in part,

to determine whether further enforcement action is necessary

to ensure compliance with

regulatory requirements.

9808240236

'780819

PDR

ADOCK 05000275

8

PDR

C

Pacific Gas and Electric Company

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be placed in the NRC Public Document Room (PDR) ~ To

the extent possible, your response should not include any personal privacy, proprietary, or

safeguards information so that it can be placed in the PDR without redaction.

Docket Nos.:

50-275; 50-323

License Nos.: DPR-80; DPR-82

Sincerely,

Arthur T. Howell III, Director

Division Reactor Safety

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/98-09; 50-323/98-09

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns)Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

h

Pacific Gas and Electric Company

-3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and.Electric Company

P.O: Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System {IPAS)

E-Mail report to Document Control Desk {DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

G. F. Sanborn, EO

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE:EA File, MS: 7-H5

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:+DC'tDC809RP.WBJ

To receive co

of document, indicate ln box: "C" = Co

without enclosures

"E" = Co

with enclosures "N" ~ No co

RIV:SRA

N

DRP/E:PE

C:DRP/E

EO

D:DRS

WBJones*

Bolson

E Mail * HWon

E Mail * GFSanborn*

ATHo

08/04/98

08/11/98

08/l2/98

08/13/98

OFFICIALRECORD COPY

08

98

Pacific Gas and Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to, DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

G. F. Sanborn, EO

W. L. Brown, RC

J. Lieberman, OE, MS: 7-H5

OE:EA File, MS: 7-H5

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:4 DC'~DC809RP.WBJ

To receive co

of document, indicate in box: "C" ~ Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:SRA

N

DRP/E:PE

C:DRP/E

EO

D:DRS

WBJones"

Bolson

E Mail * HWon

E Mail

GFSanborn*

ATHo

08/04/98

08/11/98

08/12/98

08/13/98

OFFICIAL RECORD COPY