CATEGORY 2y REGULATORY INFORMATION DXSTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:9808200231 DOC.DATE: 98/08/14 NOTARIZED: NO DOCKET I FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION MURRAY,B.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT AFFXLIATZON RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT:
Ack receipt of emergency plan Classification App E,part V &
980703 ltr,which transmitted revision 26 of implementing prodedure EP G-1, "Emergency
& Emergency Plan Activation," per 10CFR50, 10CFR50.4/
NOTES:
T DISTRIBUTION CODE:
IE35D COPIES RECEIVED:LTR J ENCLf SIZE:
TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep G
RECIPIENT ID CODE/NAME PD4-2 P
COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME BLOOM,S COPIES LTTR ENCL 1
1 0
INTERN OE DIR EXTERNAL: NOAC 1
1 1
1 1
1 NRR/DRPM/PERB RGN4 FILE 01 NRC PDR 1
1 1
1 1
1 E
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION IV 611 RYAN PLAZADRIVE. SUITE 400 ARLINGTON.TEXAS 76011.6064 August 14,1998 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177
SUBJECT:
EMERGENCY PLAN CHANGES
Dear Mr. Rueger:
This letter acknowledges receipt of your letter dated July 3, 1998, which transmitted Revision 26 of your Emergency Plan Implementing Procedure EP G-1, "Emergency Classification and Emergency Plan Activation," pursuant to 10 CFR Part 50, Appendix E, Part Y, and 10 CFR 50.4.
Based on your determinations that the changes do not decrease the effectiveness of your emergency plan and that the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approval is not required.
Our initial review of these changes indicates that the changes are in accordance with 10 CFR 50.54(q).
Implementation of these changes willbe subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan and continue to meet regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter willbe placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact Mr. Tom Andrews of my staff at (817) 860-8242.
Sincerely, Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket Nos.:
50-275 50-323 License Nos.: DPR-80 DPR-82 980820023i 980814 PDR ADOCK 05000275 F
ey
Pacific Gas and Electric Company CC:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman BumstMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Aviia Beach, California 93424
Pacific Gas and Electric Company Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Pacific Gas and Electric Company DISTRIB ON:
- DMB'(AO
)'.~~ t~.-.,
Regional dministrator DC Resident Inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File MIS System RIV File DRS Action item File (98-E-0043)(Hodges) 3..jI U<S DOCUMENT NAME:G:iIDRSLTRStEP.MLDEDC9802EP.LOO GQDRSLTRS<EP.MLD>DC9802EP.MOO TAC NX03449 To receive co of document. Indicate In b
" ~ Co without enclosures "E" = Co with endosures N = No co RIV:PSB E
THAndrews:nh
)
~
08/498
- DR PSB Murra 08W98 OFFICIALRECORD COPY
Pacific Gas and Electric Company DISTRIBUTION:
DMB (A045)
Regional Administrator DC Resident Inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File MIS System RIV File DRS Action Item File (98-E-0043)(Hodges) 4-DOCUMENT NAME: G:<DRSLTRS>EP.MLD>DC9802EP.LOO O'WDRSLTRStEP.MLD>DC9802EP.MOO TAC ¹X03449 To receive co of document, Indicate ln b
" ~ Co without enclosures "E = Co with enclosures "N ~ No co RIV:PSB E
THAndrews:nh
)
~
08/498
- DR PSB Murra 08We8 OFFICIAL RECORD COPY