ML16342E204
| ML16342E204 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/03/1998 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9808100252 | |
| Download: ML16342E204 (10) | |
Text
CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9808100252 DOC.DATE 98/08/03 NOTARIZED: NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION PELLET,J.L.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.
Pacific. Gas
& Electric Co.
SUBJECT:
Informs that GFES written operator licensing exam will be administered on 981007.Ltr listing candidates for exam must be submitted by 980904 to listed name
& address.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR ENCL SIZE-TITLE: Operator Licensing Examination Reports NOTES:
E RECIPZENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS NRR/DRCH/HOHB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT
. ID CODE/NAME BLOOMrS
~NG?8 RGN4 FILE 01 NRC PDR COPIES LTTR ENCL E
NOTE TO ALL "RIDS" RECIP'IENTS:
PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL
f k
i '".'illll; UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 Aus 3
1998 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177
SUBJECT:
GENERIC FUNDAMENTALSSECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION
Dear Mr. Rueger:
The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facilityon October 7, 1998. The GFES will consist of 100 questions.
The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score willbe 80 percent.
In order to nominate candidates, an authorized representative from your facilitymust submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing and Human Performance Branch. The letter must be received both in the Region and at NRC Headquarters by September 4, 1998, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration.
The letter must certify that the candidates willhave completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license.
The letter must also list the names of personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.
The address for the Operator Licensing and Human Performance Branch Chief is as follows:
Robert M. Gallo, Chief Operator Licensing and Human Performance Branch U.S. Nuclear Regulatory Commission Mail Stop OWFN 9 D25 Washington, DC 20555 9808100252 980803 PDR ADGCK 05000275 V
g
Pacific Gas and Electric Company Approximately 2 weeks prior to the examination administration date, your designated facility contact willbe sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)
Docket Nos.:
50-275 50-323 License Nos.: DPR-80 DPR-82 ohn L. Pellet, Chief Operations Branch Division of Reactor Safety
Enclosure:
As stated cc w/enclosure:
Tim Blake, Director Learning Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 cc w/o enclosure:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 a
- Chairman, San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408
Pacific Gas and Electric Company
-Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
lf
Pacific Gas and Electric Company
'cc to DCB (IE42) bcc distribution by RIV:
DRP Branch Chief Resident Inspector S. Bloom, NRR (OWFN 13-F-11)
RIVfile L. Miller, ITD E. W. Merschoff, RA L. A. Hurley, GFES file DOCUMENTNAME'FES1 To recoiyo copy oiioctunea IaAato ia bor.
C - Copy outhout endocune T. - Copy with ondoclec I <<No copy RIV:OB:LA LAHurley 07
/98 N
C:OB JLPellet
.07
/98
/ /98 OFFICIAL RECORD COPY
/ /98