Forwards SE Re Rev to Rv Surveillance Capsule Withdrawal Schedule.Revised Program Capable of Monitoring Effects of Neutron Irradiation & Termal Environ on Fracture Toughness of Ferritic Rv Beltline Matls
ML16342D986
Person / Time
Site: Diablo Canyon 
Issue date: 02/10/1998
From: Steven Bloom
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D987 List:
References
TAC-M99917, NUDOCS 9802240008
Download: ML16342D986 (8)


Text

CATEGORY 2 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9802240008 DOC.DATE: 98/02/10 NOTARIZED: NO DOCKET I FACIL:50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION BLOOM,S.D.

RECIP.NAME RECXPXENT AFFILIATION RUEGER,G.M.

Pacific Qas

& Electric Co.

SUBJECT:

Forwards SE re rev to RV surveillance capsule withdrawal schedule.NRC has found that rev acceptable.

DISTRIBUTION CODE:

DFOID COPIES RECEIVED: LTR 1

ENCLf SIZE: 3+

TITLE: Direct Flow Distribution:

50 Docket (PDR Avail)

NOTES:

RECIPIENT ID CODE/NAME INTERN XLE CENTER 01 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 G

0 R

D M

E N

NOTE TO ALL "RZDS" RECIPIENTS:

PZEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

. 4 ENCL 4

gas REGS

~ ~o Cy 0

Vl

~+

~

o~

++*++

UNITED STATES NUCLEAR REGULATORY COMIVIISSION WASHINGTON, D.C. 20555-0001 February 10, 1998 Mr. Gregory M. Rueger, Senior Vice President and General Manager Pacific Gas and Electric Company Nuclear Power Generation N9B P. O. Box 770000 San Francisco, California 94177

SUBJECT:

PACIFIC GAS 8 ELECTRIC COMPANY'S REVISION TO THE REACTOR VESSEL SURVEILLANCECAPSULE WITHDRAWALSCHEDULE FOR DIABLO CANYON UNIT NO. 2 (TAC NO. M99917)

Dear Mr. Rueger:

By letter dated October 22, 1997, Pacific Gas & Electric Company (PG&E) submitted for NRC approval, their proposed reactor vessel surveillance withdrawal schedule, which was based on the American Society for Testing and Materials (ASTM) E185-73 recommendations and reflected updated fluence information from the surveillance capsules removed in 1994 from Diablo Canyon Unit 2.

The NRC reviewed the PG8E submittal mentioned above, and noted that the revised surveillance program for Diablo Canyon Unit 2 is capable of monitoring the effects of neutron irradiation and the thermal environment on the fracture toughness of ferritic reactor vessel beltline materials for the subject unit.

The NRC veriTied that PG&E's proposed withdrawai schedule for Diablo Canyon Unit 2 satisfies the ASTM E 185-73 Standard.

Since this edition of the standard was current at the time the reactor vessel was purchased, the Diablo Canyon Unit 2 surveillance capsule withdrawal schedule satisfies the requirements of Appendix H to 10 CFR Part 50.

In addition, the NRC noted that PG&E has implemented the ASTM E 185-82 Standard to the maximum extent possible.

Therefore, the NRC found that the revised withdrawal schedule is acceptable for Diablo Canyon Unit 2.

f)

Iy 9802240008 9802'i0 PDR ADOCK 05000323 P

PDR

)IIIIIIIIIIIIIIIIIIIII.III,IIIIIIIIIIII,

II 0

t Mr. Giegory M. Rueger

' Enclosure 1 is the staff's safety evaluation. is a summary status of the subject surveillance capsules.

Ifyou have any questions, please contact me at (301) 415-1313.

Sincerely, Original Signed By Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-323

Enclosures:

1. Safety Evaluation
2. Summary Status cc w/encls:

See next page DISTRIBUTION:

Docket Files PUBLIC PDIV-2 r/f EGA1 WBateman EPeyton SB!oom THarris (SE)

OGC ACRS KPerkins, RIV WCFO PGwynn, Region IV TSullivan DOCUMENT NAME:DC99916.SE To receive a copy of this document, indicate In the box: "C" ~ Copy without enclosures "E" ~ Copy with enclosures "N" ~ No copy OFFICE NAME DATE PM/PDIV-2 S Bloom/tlh 02//098 LA/PDIV-2 EPeyton 02&98 OFFICIAL RECORD COPY

l

Mr. Gregory M. Rueger February 10, 1998 cc w/encls:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J. Warner, Esq.

Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Mr. Robert P. Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. O. Box 56 Avila Beach, California 93424 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ANN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, California 93940