ML16342D931

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/97-22 & 50-323/97-22 on 971208-12 & Nov.Violation Re Failure to Follow Respiratory Protection Program Procedure to Provide Prescription Glasses for Licensed Operators to Use W/Selfcontained Breathing
ML16342D931
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/02/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D932 List:
References
50-275-97-22, 50-323-97-22, NUDOCS 9801070261
Download: ML16342D931 (12)


See also: IR 05000275/1997022

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801070261

DOC.DATE: 98/01/02

NOTARIZED: NO

~

~

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

MURRAY,B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

DOCKET

05000275

05000323

SUBJECT: Forwards insp repts

50-275/97-22

& 50-323/97-22

on 971208-12

C

6 NOV.Violation re failure to follow respiratory protection

program procedure

to provide prescription glasses

for

A

licensed operators

to use w/selfcontained breathing.

T

D1STRIBUTION CODE:

1E35P

COPIES

RECEIVED:LTR J

ENCL

t

SIZE: 5

/0

TITLE: Emergency Preparedness-Appraisal/Confirmatory

Action Ltr/Exercise Re+

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERN

s FILE C

EXTERNAL: NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

NRR/DRPM/PERB

RGN4

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

0

R

MAoeo Wow

NRC FLOPPY

'D

0

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANZZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

8

ENCL

.

8

j0

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

January 2, 1998

Gregory M. Rueger, Vice President

and General Manager

Pacific Gas and Electric Company

Nuclear Power Generation, N9B

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/97-22; 50-323/97-22 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

An NRC inspection was conducted December 8-12, 1997, at your Diablo Canyon Nuclear Power

Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that

inspection.

One violation of NRC requirements was identified for failure to follow a respiratory protection

program procedure to provide prescription glasses for licensed operators to use with self-

contained breathing apparatus.

The eyeglasses

were unavailable for use because

licensed

operators were not aware of the location of the eyeglasses.

The violation is of concern because

it indicates ineffective corrective actions for a previously identified, similar violation.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report. The NRC has

concluded that information regarding the reason for the violation, the corrective actions taken

and planned to correct the violation and prevent recurrence is already adequately addressed

on

the docket in the enclosed report. Therefore, you are not required to respond to this letter

unless the description therein does not accurately reflect your corrective actions or your position.

In that case, or ifyou choose to provide additional information, you should followthe instructions

specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response willbe placed in the NRC Public Document Room. To the

extent possible, your response should not include any personal privacy, proprietary, or

safeguards

information so that it can be placed in the PDR without redaction.

'P80i07026i 980i02

PDR

ADOCK 05000275

8

PDR

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

g(~

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-275; 50-323

License Nos.: DPR-80; DPR-82

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-275/97-22; 50-323/97-22

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman BurnshMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Pacific Gas and Electric Company

-3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

Training, Exercises,

8 Evaluation

Branch Chief

FEMA Region IX

Building 105

Presidio of San Francisco

San Francisco, CA 94129

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE35)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

C. A. Hackney, SLO

AI 97-G-0180

DOCUMENT NAME: G:IREPORTS'IDC722RP.GMG

To receive copy of document, Indicate In box: "C" = Copy without enclosures

"E" = Copy with enclosures "N"= No copy

RIV:PSB

E

C:DRSiPSB

C:DRPiE

GMGood:nh ~ %

12P~97

BMurray

12

/97

HWong

12P},/97

OFFICIALREC

. COPY

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE35)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

C. A. Hackney, SLO

AI 9'7-G-0180

DOCUMENT NAME: G:>REPORTSiDC722RP.GMG

To receive copy of document, indicate In box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV:PSB

E

C:DRSiPSB

C:DRPiE

GMGood:nh ~'=A

12/" 497

8Murray

12

/97

HWong

12+/97

OFFICIAL RECQQD COPY

'A<"

~%'qonag

0