Forwards Insp Repts 50-275/97-12 & 50-323/97-12 on 970720- 0830.No Violations Noted.Operators Timely Response to Loss of Oil Flow in Main Transformer Prevented Shutdown of Unit
ML16342D790
Person / Time
Site: Diablo Canyon  
Issue date: 09/16/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D791 List:
References
50-275-97-12, 50-323-97-12, NUDOCS 9709190163
Download: ML16342D790 (12)


See also: IR 05000275/1997012

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9709190163

DOC.DATE: 97/09/16

NOTARIZED: NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNNFT.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT: Forwards insp repts

50-275/97-12

& 50-323/97-12

on 970720-

0830.No violations noted.Operator's

timely response

to loss

of oil flow in main transformer

prevented

shutdown of unit.

DISTRIBUTION CODE:

ZEOIF

COPIES

RECEIVED:LTR 3

ENCL (

SIZE: 5 /

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

BLOOMFS

COPIES

LTTR ENCL

'1

1

8

Q

0

INTERNAL: ACRS

AEOD/TTC

kW~EW>

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

XTERNAL: LITCO BRYCE,J

H

NRC PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

'1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

1

1

1

1

1

1

1

1l,l

1

1

1

1

1

1

R

0

MADRIDFaoM

NRC FLOPPY

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

g0,8 RECVEE

~C

P~

+c

i g

+*i<<~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

SEP

I 6

I997

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation

Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, 814A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/97-12; 50-323/97-12

Dear Mr. Rueger:

An NRC inspection was conducted July 20 through August 30, 1997, at your Diablo

Canyon Nuclear Power Plant, Units

1 and 2, reactor facilities. The enclosed report

presents the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at Diablo

Canyon was generally characterized

by competent,

professional,

and safety-conscious

performance of operations,

maintenance,

engineering,

and plant support.

During the

inspection period, the operators'imely response

to the loss of cooling oil flow in a main

transformer prevented

a shutdown of the unit.

In addition, replacement of the Unit 1 main

steam safety valve discs with Inconel X-750 discs and the current augmented test program

for the main steam safety valves has indicated promising improvement

of the performance

and reliability of these valves.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

mas

.

wyn, Dire t

Division of React

r Pro'

9709i90i63 9709i6

PDR

ADQCK 05000275

6

PDR

lllllllllllllllll!Illilllllllllllllll!

Pacific Gas and Electric Company

-2-

Docket Nos.:

50-275

50-323

License Nos.:

DPR-80

DPR-82

Enclosure:

NRC Inspection Report

50-275/97-01 2; 50-323/97-01 2

cc w/enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns)Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Pacific Gas and Electric Company

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56,

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

-4-

SEP

l 6

l9ST

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

report to T. Frye (TJF)

report to T. Hiltz (TGH)

report to NRR Event Tracking System (IPAS)

report to Document Control Desk (DOCDESK)

report to Richard Correia (RPC)

report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PS 8

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:i DCiDC712RP.DBA

To receive copy of document, indicate in box: "C" = Copy without enctosures

"E" = Copy with enctosures

"N""-No copy

RIV:RI:DRP/E

C:DRP/E

09/1 6/97

09/1 6/97

DBAllen

HJWong

[DBA via e-mail]

[HJW via e-

mail)

D:DRP

TPGwy

09/

97

Pacific Gas and Electric Company

-4-

SEP

i 6

I99T

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

report to T. Frye (TJF)

report to T. Hiltz (TGH)

report to NRR Event Tracking System (IPAS)

report to Document Control Desk (DOCDESK)

report to Richard Correia (RPC)

report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc'distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:i DciDC712RP.DBA

To receive copy of document, Indicate in box: "C" = Copy without enctosures

"E" = Copy with enciosures "N" = No copy

RIV:RI:DRP/E

DBAllen

[DBAvia e-mail]

09/1 6/97

C:DRP/E

HJWong

[HJW via e-

mail)

09/1 6/97

D:DRP

TPGwy

09/

97

0