Forwards Insp Repts 50-275/97-201 & 50-323/97-201 on 970609-12.No Violations Noted
ML16342D787
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/11/1997
From: Richards S
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D788 List:
References
50-275-97-201, 50-323-97-201, NUDOCS 9709180107
Download: ML16342D787 (8)


See also: IR 05000275/1997201

Text

'PP RE00

0

Cy

0

C

O

IVl0

Y/

"0

++*<<"

grV

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON~ 0 C

2055&0001

September

11 '997

Mr. Greec"y

M. Rueger

Pacific Gas

& Electric Company

NPG-Mail Code

A10D

PO Box 770000

San Francisco.

CA

94177

Dear

Mrs Rueger:

SUBJECT:

NRC

INSPECTION OF THE DIABLO CANYON POWER

PLANT (REPORT

NOS.

50-275/97201

AND 50-323/97201)

During the period June 9-12,

1997. the Special

Inspection

Branch of tne U.S.

Nuclear Regulatory Commission's

(NRC's) Office of Nuclear Reactor

Regulation

(NRR) performed

an inspection of Pacific Gas

8 Electric Company's

(PG8E's)

activities related to the procurement'odifications

testing

and installation

of replacement

4-kV circuit breakers

at the Diablo Canyon

Power Plant

(DCPP)

~

Units

1 and 2.

The primary purpose of the inspection

was to determine if design verification

testing of the modified breaker

was accomplished

in accordance

with applicable

requirements

of American National Standards

Institute (ANSI)/Institute of

Electrical

and Electronic Engineers

( IEEE) Standards'

secondary

purpose of

the inspection

was to examine several

related

issues

involving production

testings modifications'nd post installation testing in-service

failures'he

results of this inspection are contained in the enclosed

inspection

report.

II!III!IIIIIIIIIIIJlllllltlllllllll~It R<IE C>><R +II'V

With respect to design verifications the inspectors

determined that PG&E's

approach

was generally consistent with the applicable

NRC regulations

in that

PG&E undertook to verify. by engineering

analysis

and

a testing

program, that

DCPP's safety-related

4-kV electrical distribution system,

as converted

and

modified, would perform its safety functions under all design basis

conditions.

By NR(. let".er dated July 24,

1997 (Attachment

1 to the enclosed

inspection report). the question of consistency of the approach with

applicable industry standards,

in particular, taking credit for certain design

verification tests

done by the manufacturer of the circuit breakers

used in

the conversions

was referred to the Standards

Board of the

IEEE for

consideration

by the appropriate

subcommittee.

The details of the

IEEE

response.

contained in an August 21.

1997, letter from the

IEEE Power

Engineering Society Switchgear

Committee (Attachment

2 to the enclosed

report). are discussed

in the report.

In summary.

the

PG&E approach is

considered

consistent with the intent of the standards.

Although there is no

regulatory guide endorsing the standards

in question,

PG&E has committed to

them in the Final Safety Analysis Report

(FSAR) for

DCPP,

and they are

therefore relevant to the design

and licensing basis of the plant.

With

regard to the engineering

evaluations

necessary

to support the

PG8E approach,

the inspectors

could not

~ on the basis of documentation available for review

at

DCPP

~ conclusively determine the adequacy of all the justifications for not

reperforming certain design tests.

9709i80i07 9709ii

PDR

ADOCK 05000275

8

PDR

III

Mr. Gregory

M. Rueger

-2-

Theref'ore,

the inspectors identified the need for further review at National

Technical

Systems

(NTS)

~ Inc., Acton, Massachusetts;

and possibly also

Power

Distribution Services

(PDS), Inc.. Cincinnati, Ohio.

In accordance

with 10 CFR 2.790 of the Commission's

regulations'

copy of this

letter and inspection report will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning the attached

inspection

reports

please

contact the inspection

team leader,

Mr. Stephen

Alexander, at (301) 415-2995.

Sincerely,

/

/

Stuart A. Richards,

Chief

Special

Inspection

Branch

Division of Inspection

and Support

Programs

Office of Nuclear Reactor

Regulation

cc:

See next page

Docket Nos.

50-275 and 50-323

License Nos.:

DPR-80 and DPR-82

Enclosure:

Inspection Report

No. 50-275,323/97201

Distribution:

<<"iOocket-Ff le's,-.50-276':and.50.-.323,>

PSIB"R/F

PDR

WBateman.

PD 4-2

-PGwynn,

RIV

SBloom,

NRR,

DCPP

PM

PGage.

RIV

-CPaulk,

RIV

- RWise,

RIV

JLee.

NRR

RFor tuna,

OI

~ PJukoff. OI/RIV

- EWilliamson. OI/RIV

SAlexander

(2 signed copies)

Sl~ck

PPdr cQ KY'g< R ~~

DOCUMENT NAME:

G:KALEXANDENDIABLO.IR

  • See previous concurrence.

To receive s redacted copy ot thta document, Indicate in the box:

C

Copy without sttachmentlenclosure

E

~ Copy with attachment/enclosure

N

No copy

OFFICE

PSIB

PS

PS:

C

SAlexander:s f

G

richards

DATE

7/31/97*

'7g Rgb

9/ //97

9// /97

/

/97

Mr. Gregory

M. Rueger

- 3-

September

11.

1997

CC:

NRC Resident

Inspector

Diablo Canyon Nuclear

Power Plant

c/o U.S. Nuclear Regulatory Commission

P.O.

Box 369

~

Avila Beach

~ Cali fornia

93424

Dr. Richard Ferguson

~ Energy Chair

Sierra

Club Cali fornia

1100 lith,Street,

Suite

311

Sacramento.

Cali forni a

95814

Ms. Nancy Culve"

San Luis Obispo

Mothers for Peace

P.O.

Box 164

Pismo Beach, California

93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

P.O.

Box 112

County Government

Center

San Luis Obispo. California

93408

Mr. Truman Burns

Mr. Robert Kinosian

California Public Utili'ties Commission

505 Van Ness,

Room 4102

San Francisco,

California

94102

Mr. Steve

Hsu

Radiologic Health Branch

State

Department of Health Services

Post Office Box 942732

Sacramento,

California

94232

Diablo Canyon

Independent

Safety

Committee

ATTN:

Robert

R. Wellington,

Esq.

Legal Counsel

857 Cass Street,

Suite

D

Monterey. California

93940

Regional Administrator,

Region

IV

U.S. Nuclear Regulatory Commission

Harris

Tower

8 Pavilion

611

Ryan Plaza Drive, Suite 400

Arlington, Texas

76011-8064

Christopher J.

Warner,

Esq.

Pacific Gas

8 Electric Company

Post Office Box 7442

San Francisco.

California

94120

Mr. Robert

P.

Powers

Vice President

and Plant Manager

Diablo Canyon Nuclear

Power Plant

P.O.

Box 56

Avila Beach,

Cali.fornia

93424

Telegram-Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

San Luis Obispo,

CA

93406

Mr. Gregory

M. Rueger

September

11,

1997

cc w/encl:

NRC Resident

Inspector

Diablo Canyon Nuclear

Power Plant

c/o U.S. Nuclear Regulatory

Commission

P.O.

Box 369

Avila Beach. California

93424

Dr. Richard Ferguson.

Energy Chai r

Sierra Club California

1100 lith,Street.

Suite 311

Sacramento.

Cali fornia

95814

Ms.

Nancy Culver

San Luis Obispo

Mothers for Peace

P.O.

Box 164

Pismo Beach, California

93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government

Center

San Luis Obispo. California

93408

Mr. Truman Burns

Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness.

Room 4102

San Francisco.

Cali fornia

94102

Mr. Steve

Hsu

Radiologic Health Branch

State

Department of Hea',th ~ervices

Post Office Box 942732

Sacramento.

California

94232

Diablo Canyon

Independent

Safety

Committee

ATTN:

Robert

R. Wellington. Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey. California

93940

Redwood Alliance

P.O.

Box 293

Arcata, California

95521

Regioral Administrator.

Region

IV

U.S. Nuclear Regulatory

Commission

Harris Tower

8 Pavilion

611

Ryan Plaza Drive, Suite 400

Arlington. Texas

76011-8064

Christopher

J.

Warner,

Esq.

Pacific Gas

8 Electric Company

Post Office Box 7442

San Francisco,

California

94120

Mr. Robert

P.

Powers

Vice President

and Plant Manager

Diablo Canyon Nuclear

Power Plant

P.O.

Box 56

Avila Beach, California

93424

Chief. Fuel Cycle and Decommissioning

Branch,

Region

IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 400

Arlington. Texas

76011-8064

Mr. Peter

H. Kaufman

Deputy Attorney General

State of California

110 West A Street,

Suite

700

San Diego. Cali fornia

92101

Mr. Thomas

A. Moulia

Humboldt Bay Plant Manager

Humboldt Bay Nuclear

Power

Plant

1000 King Salmon Avenue

Eureka. California

95503

Chairman,

Humboldt County Board

of Supervisors

County Courthouse

825 Fifth Street

Eureka, California

95501