Informs That NRC Scheduled on-site Design Inspection for Diablo Canyon Nuclear Generating Station for Period of 970804-0912
ML16342D711
Person / Time
Site: Diablo Canyon  
Issue date: 06/17/1997
From: Bateman W
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9706190260
Download: ML16342D711 (8)


Text

4

~

Cy J

ClO Vl0

+rr+

~O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 June 17, 1997 Mr. Gregory M. Rueger Senior Vice President and General Manager Pacific Gas and Electric Company NPG Mail Code A10D P.O.

Box 770000 San Francisco, CA 94177

SUBJECT:

DIABLO CANYON NUCLEAR POWER STATION DESIGN INSPECTION

Dear Mr. Rueger:

During the time period of August 4 through September 12,

1997, we have scheduled an on-site design inspection of your Diablo Canyon Nuclear Generating Station.

Your staff has indicated that there are no major conflicts with onsite activities during this period.

The two mechanical systems selected are the Auxiliary Salt Water (Unit 2) and Containment Heat Removal Systems (Unit 1).

In addition, support and interface systems will be reviewed as well as the electrical distribution system.

We will contact your staff to request material needed to support the on-site and off-site reviews.

The team leader, and/or assistant team leader, and two team members of the inspection team are scheduled to visit the site between 'July 14 and July 16, 1997, to ensure that all requested documentation has been provided to facilitate the in-office review and on-site inspection.

Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the actual plant configuration or operations were inconsistent with the design basis, licensing basis, or the UFSAR.

Thus, the purpose of this inspection is to evaluate the capability of the systems to perform safety functions required by their design and licensing bases and to verify consistency of the as-built configuration with the final safety analysis report.

Inspection Procedure (IP) 93801, "Safety System Functional Inspection" will be used to perform the design inspection.

Mr. Morris Branch, Team Leader, and Serita Sanders, Assistant Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection.

The inspection will be performed by a team of five engineerP from Sargent and Lundy (S&L) who have been contracted by the NRC for this purpose.

Mr. Mansoor Sanwarwalla of SSL who is part of the five person team will be the lead contractor engineer.

9706i90260 9706i7 PDR ADOCK 05000275 6

PDR

/

~~ ~yHICSPY

1 I

fr;

We will be in contact with your staff regarding additional details for the inspection.

Should you have any questions, please contact Hr. Branch at (301) 415-1279 or myself at (301) 415-1372.

Sincerely, Q~

William H. Bateman, Project Director Division Reactor Projects Office of Nuclear Reactor Regulation cc:

See next page

dune 17, 1997 We will be in contact with your staff regarding additional details for the inspection.

Should you have any questions, please contact Mr. Branch at (301) 415-1279 or myself at (301) 415-1372.

Sincerely, (Original Signed By)

William H. Bateman, Project Director Division Reactor Projects Office of Nuclear Reactor Regulation cc:

See next page Distribution:

DOCKET FILE (50-275/323)

PSIB R/F Central Files PUBLIC ACRS OGC

HWong, RIV TLH3 (SE)

WHBateman EAdensam JRoe

SBloom, PM FPGillespie,'ERR RPZimmerman, NRR DOCUMENT NAME: G:)ANNOUNCE.DC To receive e copy of this document, indicete in the box: "C" ~ Copy without enclosures "E" ~

y

'th enclosures "N" ~ No copy OFFICE PSIB:DISP PSIB:DISP PSIB:D P

P Q

DRP:NRR NAME SSanders S~

MBranch DPN kin RMGal o

WHBatema DATE 06//2. /97 06/lg./97 06 7

OFFICIAL R ORD COPY 068

/97 06/1

/97

L'

Hr. Gregory H. Rueger cc w/encl:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.O.

Box 369 Avila Beach, California '3424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Hs.

Nancy Culver San Luis Obispo Hothers for Peace P.O.

Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Hr. Truman Burns Hr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Hr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O.

Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Honterey, California 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 5 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J.

Warner, Esq.

Pacific Gas

5. Electric Company P.O.

Box 7442 San Francisco, California 94120 Hr. Robert P.

Powers Vice President and Plant Hanager P.O.

Box 56 Avila Beach, California 93424 Telegram-Tribune ATTN:

Hanaging Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406

i ~