CATEGORY 2
REGULATORY INFORMATTON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9706030028
DOC.DATE: 97/05/30
NOTARIZED:
NO
FACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
50-323 Diablo Canyon Nuclear
Powe: Plant, Unit 2, Pacific
AUTH.NAME
AUTHOR AFFILIATION
HOWELL,A.T.
Region
4 (Post
820201)
RECIP. NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards insp repts
50-275/97-07
6 50-323/97-07
on
970428-0502.No violation noted.
DISTRIBUTION CODE:
IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET I
Ga
05000275
Ga
05000323
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
ILE
NRR DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
TERNAL: LITCO BRYCEgJ
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
-1
1
1
LOADED FROM
Mac FLapp Y
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT'THE DOCUMENT CONTROL DESKS
ROOM OWFN SD-5 (EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM
'DISTRIBUTION LISTS
FOR
DCCUMENTS
YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
.20
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
May 30. 1997
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation
Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation,
B14A
77 Beale Street, Room 1451
P.O. Box 770000
San Francisco, California 94177
SUBJECT:
NRC INSPECTION REPORT 50-275/97-07; 50-323/97-07
Dear Mr. Rueger:
An NRC inspection was conducted
April 28 through May 2, 1997, at your Diablo Canyon
Nuclear Power Plant, Units
1 and 2, reactor facilities. The enclosed report presents
the
scope
and results of that inspection.
The final results of this inspection were discussed
with Mr. T. Grebel of your staff on May 29, 1997.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Arthur T. Howell III, Director
Division of Reactor Safety
Docket Nos.:
50-275; 50-323
License Nos.:
Enclosure:
NRC Inspection Report
50-275/97-07; 50-323/97-07
9706330028
970530
ADOCK 05000275
8
lllllililllilllllilIlllllllll)llllll
Pacific Gas and Electric Company
-2-
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns(Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco,
California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent
Safety Committee
857 Cess Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Pacific Gas and Electric Company
Robert P. Powers, Vice President
and Plant Manager
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson
Avenue
P.O. Box 112
San Luis Obispo, California 93406
Pacific Gas and Electric Company
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:t DC<DC707rp.wpa
To receive copy of document,
Indicate in box: "C" = Copy without enciosures
"E" = Copy with enciosures
"N" = No copy
RIV:SRI:EB
C:EB
D:DRP
D:DR
WPAng/Imb
05/<97
CAVa
urgh
TPGwyn
05
97
05/ /97
OFFICIAL RECOR
OPY
ATHowell III
05/30/97
Pacific Gas and Electric Company
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:$ DC<DC707rp.wpa
To receive copy of document,
indicate in box: "C" = Copy without enclosures
"E" = Copy with enciosures
"N" = No copy
RIV:SRI:EB
WP
ng/Imb
05/
97
C:EB
DiDRP
TPGwyn
CAVa
urgh
05
97
05/ /97
OFFICIAL RECOR
OPY
D:DR
ATHowell III
05/0/97
0