Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/21/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D668 List:
References
50-275-97-03, 50-275-97-3, 50-323-97-03, 50-323-97-3, EA-97-252, NUDOCS 9706020121
Download: ML16342D667 (10)


See also: IR 05000275/1997003

Text

GAZEBOS.Z

4

REGM~ATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9706020121

DOC,DATE: 97/05/21

NOTARIZED:

NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit

1,, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

~

~

~

UTH. NAME

AUTHOR AFFILIATION

'YNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPlENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards

insp repts

50-275/97-03

6 50-323/97-03

on

970316-0426

6 NOV.Violation.involved failure to properly

translate. design info into calculations

s plant

er<<ergency

operating

procedures.

DISTRIBUTION CODE:

IEOlF

COPIES

RECEIVED:LTR

ENCL

SIZE:

TlTLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E(

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

EXTERNAL: LITCO BRYCE,J

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

PCADED vaov

i BRc FLGPPY

E

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIV"D BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

,20

0

~p,R RECT~1p0

C

O

4~i

w+

~v.

/p Jf>>*<<4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Iv

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

May 21, 1997

EA 97-252

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation

Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco,

California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/97003; 50-323/97003 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

This refers to the inspection conducted

on March 16 through April 26, 1997, at your

Diablo Canyon Nuclear Power Plant, Units

1 and 2 reactor facilities. The enclosed report

present's the scope and results of that inspection.

'I

During the inspection period three violations were identified. Two violations are related to

the Unit

1 turbine driven auxiliary feedwater pump and reflect the need to focus additional

management

attention on assuring that deficient conditions are identified and addressed

promptly and actions are taken to resolve the root causes

of the deficiencies.

The first

violation involved the failure to implement corrective actions to improve controls for

painting activities which affected that Unit 1 turbine driven auxiliary feedwater pump.

The

second, violation involved the failure to properly translate design information into

calculations and plant emergency

operating procedures.

The third violation involved the

failure to initiate appropriate corrective actions after identifying abnormally high

concentrations

of water in the Unit 1 turbine driven auxiliary feedwater pump governor.

Your staff continues to demonstrate

a strong capability to identify problems; however,

corrective actions for identified deficiencies were noted to have not been effectively

implemented.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosures,

and your response

will be placed in the NRC Public Document Room (PDR).

To the extent possible,

your. response

should not include any personal privacy, proprietary,

or safeguards

information so that it can be placed in the PDR without redaction.

llllllllllllllllllllllllllllllllllllll

9706020i2i

970521

PDR

ADOCK 05000275

6

PDR

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,'homas

P. Gwynn, Director

Division of Reactor Projects

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosures:

1. Notice of Violation

2.

NRC Inspection Report

50-275/97003; 50-323/97003

cc w/enclosures:

Dr. Richard

Ferguson'nergy

Chair-

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo'County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Pacific Gas and Electric Company

-3-

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

\\

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California'3406

Pacific Gas and Electric Company

-4-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

I

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

. G. F. Sanborn,

EO

OE:EA File, MS: 7-H5

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

WCFO File

W. L. Brown, RC

$ llr 4 IS ~ g+~

DOCUMENT NAME: R:tt DCiDC703RP.MDT

To receive copy of document,

indicate in box: "C" = Copy witho t encj sures

"E" = Copy with enclosures

"N" = No copy

RIV:SRI

MDTschiltz

C:DRP/E

D:DRP

HJWong ~

TPGwynn'5~97

05/+97

05

97

OFFICIAL RECORD COPY

jr)qr)