Advises of NRC Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML16342D622
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9705120309
Download: ML16342D622 (14)


Text

cpR EC(p(

c>"

'tp gfJ UNITE D STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA ORIVE, SUITE 400 ARLINQ3QN, TE)fats 76011 8064 MAY -0 l997 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Scale Street, Room 1451 P.O. Box 770000, San Francisco, California 94177

SUBJECT:

SEMIANNUALPLANT PERFORMANCE REVIEW (SPPR) - DIABLO CANYON, UNITS 1 AND 2

Dear Mr. Rueger:

On March 25, 1997, the NRC staff completed the SPPR of Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The SPPR for Diablo Canyon involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from October 1, 1996, through March 1997.

SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Diablo Canyon SPPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Mr. Howard Wong at (510)-975-0296.

Sincerely, Thomas P. Gwyn, Dir ctor Division of Reacto jects Docket Nos.:

50-275 50-323 License Nos.:

DPR-80 DPR-82 9705i20309 970505 PDR ADQCK 05000275 6

PDR

///I///I////II/////////////////////////

0

+4 Pacific Gas and Electric Company

Enclosure:

Inspection Plan cc: w/enclosure Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120

Pacific Gas and Electric Company Robert P. Powers, Vice President and Plant Manager Diablo, Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company MAY -5 I997 bcc to DCD (IE01) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief;DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File S. Bloom, NRR R. V. Azua, DRP Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME: G:ttDRPDIRttSPPRiDC.LTR To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy C:DRPltE HJWong;cm 04/24/97 (BJO)

D:DRS ATHo II 97 D:DRP TPGw nn 0 /g/97 OFFICIAL RECORD COPY

Pacific Gas and Electric Company HAY -5 j997 bcc to DCD (IE01) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File S. Bloom, NRR R. V. Azua, DRP Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME: G:>DRPDIRiSPPRiDC.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enciosures "N" = No copy C:DRPiE HJWong;cm 04/24/97 (BJO)

D:DRS ATHo I

97 D:DRP TPGw nn 0 /g/97 OFFICIAL RECORD COPY

DIABLO CANYON POWER PLANT INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION IP 71001 IP 92903 IP 73753 IP 71715 IP 83750 IP 62706 IP 73756 N/A IP 84750 Tl-132 TITLE/

PROGRAM AREA Licensed Operator Requalification Program Followup - Engineering Inservice Inspection Sustained Control Room and Plant Observation Occupational Radiation Exposure Maintenance Rule Baseline Inservice Testing of Pumps and Valves Architect - Engineering Inspection Radioactive Waste Treatment and Effluent and Environmental Monitoring Malevolent Use of Vehicles NUMBER OF INSPECTORS DATES 4/14-1 8/97 4/21-25/97 4/21-25/97 4/21-5/2/97 5/1 2-1 6/97 7/7-1 1/97 7/14-18/97 7/28-8/8/97 8/25-29/97 9/2-5/97 TYPE OF INSPECTION/COMMENTS Core Inspection-Regional Initiative. Followup of engineering open items.

Core Inspection Regional Initiative Core Inspection Regional Team (required by NRR program office)

Regional Initiative Special Headquarters Initiative Core Inspection Temporary InstructIon

~

I

IP 37750 IP 64704 Engine enng Fire Protection Program 10/20-24/97 1 1/3-7/97 1 1/3-7/97 10/20-24/97 Core Inspection Core Inspection IP 40500 IP 83750 IP 82701 IP 81700 Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems Radiation Protection Emergency Preparedness Operational Status Inspection Physical Security Program 1 2/1-5/97 1 2/1 5-1 9/97 8/4-8/97 1 2/8-1 2/97 8/1 1-1 5/97

.Core Inspection Core Inspection Core Inspection Core Inspection

0