ML16342D611

From kanterella
Jump to navigation Jump to search
Reissues 970415 NOV Associated W/Insp Repts 50-275/97-02 & 50-323/97-02.One Line of Text Missing from Top of Page 2 of Nov.Missing Line Associated W/Violation a
ML16342D611
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/29/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D612 List:
References
50-275-97-02, 50-275-97-2, 50-323-97-02, 50-323-97-2, NUDOCS 9705060313
Download: ML16342D611 (8)


See also: IR 05000275/1997002

Text

CATEGORY .2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9705060313

DOC.DATE: 97/04/29

NOTARIZED:

NO

DOCKET I

~

~

~

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNNFT.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT: Reissues

970415

NOV associated

w/insp repts

50-275/97-02

&

50-323/97-02

w/missing line added to page

2.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

I

ENCL

f

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD~~

ENTH

NRR DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

XTERNAL: LITCO BRYCEFJ

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

D

E

N

iI

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

0

I

.

gp,8 RECy~

O~

Cy

An0

o'k*J(k

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

R EG ION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

April 29,

1997

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation

Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

REISSUANCE OF NOTICE OF VIOLATIONFOR DIABLO CANYON INSPECTION

REPORT 50-275/97002; 50-323/97002

Dear Mr. Rueger:

We have identified that the Notice of Violation (NOV) associated

with Diablo Canyon

Inspection Report 50-275/97002; 50-323/97002 issued on April 15, 1997, was missing

one line of text at the top of page 2 of the NOV. This missing line is associated

with

Violation A(3).

We are reissuing the NOV in its entirety and a lined out original.

Please replace the

originally issued NOV with the enclosed

(revised NOV and lined out original).

Nothing else

has been modified.

A response to the violation is required within 30 days of the date of

this letter.

We apologize for any inconvenience

this may cause.

Should you have any questions

concerning this change, we will be pleased to discuss them with you.

Sincerely,

Division of Reactor Projects

Docket Nos.:

50-275

50-323

License Nos.:

DPR-80

DPR-82

Enclosures:

1. Notice of Violation (revised)

2. Original Notice of Violation (lined out)

9705060323

970429

PDR

ADOCK 05000275

6

PDR

llliilllillllllllilllllllllllllllllllll

Pacific Gas and Electric Co.

-2-

'c w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Pacific Gas and Electric Co.

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California 93406

I

Pacific Gas and Electric Co.

-4-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

,".bcc'to..DCD.,IE01-.-..,

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

~

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: G:ttDIABLOltREPORTStDC9702.NOV

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV:C:DRPiE

HJWong

04/

97

D:DRP

TPGwynn

0~

7

t

I"

I

ht