UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 3, 1997
$0-g7 K/MM Mr. N. J. Liparulo, Manager Regulatory
& Engineering Networks Westinghouse Electric Corporation Nuclear Technology Division S/j~r P.O.
Box 355 Pittsburg, Pennsylvania 15230-0355
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-96-1054)
Dear Mr. Liparulo:
'I By [[letter::DCL-97-033, Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90|letter dated February 25, 1997]], Pacific Gas and Electric Company submitted WCAP-14795, "NRC/Utility Meeting on Model 15 SG Tube Integrity and ARC Methodology," December
- 1996, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.
A nonproprietary version (WCAP-14796) was also submitted for placement in the Public Document Room.
An affidavit executed by Henry A. Sepp, dated December 18,
- 1996, was included in the application.
Westinghouse Electric Corporation states that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
"(a)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.)
where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.),
the application of which data secures a competitive economic advantage, e.g.,
by optimization or improved marketability.
(c)
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a
similar product.
(e)
It reveals aspects of past,
- present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse."
)
We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of Westinghouse Electric Corporation statem'ents, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
970407025l 970403 PDR ADGCK 05000275 P
o Hr.. N,. J. Liparulo Therefore, we have determined that the document entitled "NRC/Utility Meeting on Model 15 SG Tube Integrity and ARC Methodology," marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section
=103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
'rises, we may send cop'ies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for, handling proprietary information.
If the basis for withholding this information from'ublic inspection should change in the future such that'he information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request i.ncludes your information.
In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, ORIGINAL SIGNED BY Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
Docket (50-275, 50-323)
PUBLIC PDIV-2 Reading JRoe EAdensam WBateman
.EPeyton SBloom HPSiemien
- HWong, WCFO JStrosnider DOCUMENT NAME:
WITH.W OFC PD4-2 NAME EPeyt n:es DATE 3/I l/97 ENCB JStrosni r
3
/97 OGC HPSi emi en 3
97 PDIV-2
/I8 97 OFFICIAL RECORD COP
~~ >err/ t
4 f
l k
}
rt
(
Mr. N. J. Liparulo t
II N
Therefore, we have determined that the document entitled "NRC/Utility Meeting on Model 15 SG Tube Integrity and ARC Methodology," marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, cc:
See next page Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
(
V'
~
~
rt Hr, N. J. Liparulo
'I
~I CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Hs.
Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Hr. Truman Burns Hr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Hr. Steve Hsu Radiologic Health Branch State Department of Kealth Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower
& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J.
- Warner, Esq.
Pacific Gas
& Electric Company Post Office Box 7442 San Francisco, California 94120 Hr. Robert P.
Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. 0.
Box 56 Avila,Beach, California 93424 Telegram-Tribune ATTN:
Managing Editor 1321 Johnson Avenue P.O.
Box 112 San Luis Obispo, California 93406 Mr. Gregory H. Rueger Pacific Gas and Electric Company NPG - Mail Code A10D P.O.
Box 770000 San Francisco, California 94177
4
~
~
\\
l I
I~