Advises of Planned Insp Effort Resulting from Plant Sppr Review Completed on 961029 for Period Mar-Sept 1996
ML16342D486
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/29/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9612050056
Download: ML16342D486 (12)


Text

UN IT E O STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA ORIVE, SUITE 400 ARLINGTON. TEXAS 76011 8064 NOV 29 898 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, 814A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177

SUBJECT:

SEMIANNUALPLANT PERFORMANCE REVIEW (SPPR) - DIABLO CANYON POWER PLANT On October 29, 1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Diablo Canyon.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The SPPR for Diablo Canyon involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March 1996 through September 1996.

SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Diablo Canyon SPPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Howard Wong at 510-975-0296.

Sincerely, J. E.

yer, Director Division of Reactor Projects 96i2050056 96ii29 PDR ADOCK 05000275 8

PDR

Pacific Gas and Electric Company Docket Nos.:

50-275 50-323 License Nos.:

DPR-80 DPR-82

Enclosure:

Inspection Plan cc w/enclosure:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns)Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234

Pacific Gas and Electric Company Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424

Pacific Gas and Electric Company NOV 2S lg96 bcc,to,DMB (IE01) bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

R. Azua (DRP/TSS)

DOCUMENT NAME: G:iDRPDIRiSPPRiDC.LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/E C:DRP/E C

D:DRS D:DRP DECorporandy:jb 1 1/26/96 FRHuey 1 1/26/96 TPGwynn 11

/96 JEDye 1 1/g

/96, OFFICIAL RECORD COPY 050026

Pacific Gas and Electric Company NOV 2S 96 bcc to DMB (IE01) bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

'enior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

R. Azua (DRP/TSS)

DOCUMENT NAME: G:iDRPDIRiSPPRiDC. LTR To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/E C

C: DRP/E C

D:DRS D:DRP DECorporandy:jb 1 1/26/96 FRHuey 1 1/26/96 JEDye TPGwynn 1 1/2

/96 11

/96 OFFICIAL RECORD COPY

DIABLO CANYON POWER PLANT INSPECTION PLAN IP - Inspection Procedure Tl - Tempor ary Instruction Core Inspection

- Minimum NRC Inspection Program (mandatory all plants)

INSPECTION IP 71001 IP 71715 IP 62706 TITLE/

PROGRAM AREA Requalification Inspection Control Room Observation Maintenance Rule Audit NUMBER OF INSPECTORS PLANNED INSPECTION DATES 4/14-1 8/97 4/28 - 5/2/97 7/7-1 1/97 TYPE OF INSPECTION COMMENTS Core Inspection Regional Initiative. For observation of operator activities.

Core Inspection