ML16342D438
| ML16342D438 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/19/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342D437 | List: |
| References | |
| NUDOCS 9609240246 | |
| Download: ML16342D438 (10) | |
See also: IR 05000275/1996019
Text
@p,S RECT('Fp
S
4 w
",
~
c
= 'S.JIItI'j'
0 y~g4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA ORIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
i 9 t998
!'regory
M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B14A
77 Beale Street, Room 1451
P.O. Box 770000
San Francisco, California 94177
SUBJECT:
NRC INSPECTION REPORT 50-275/96-19; 50-323/96-19 AND NOTICE OF
VIOLATION
Dear Mr. Rueger:
A special NRC inspection was conducted August 5-9, 1996, at your Diablo Canyon Power
Plant, Units
1 and 2 reactor facilities. The enclosed report presents the scope and results
of that inspection.
3
During this inspection, your conduct of,activities at the Diablo Canyon Power Plant facility
~
~
~
was generally characterized
by safety-conscious
operations.
However, two violations of
NRC requirements were identified.
In the first instance, procedures
controllin'g high voltage
grounding devices (ground buggies) were not followed. We are particularly concerned that
corrective actions implemented in response to the October 1995 failure event of Auxiliary
Transformer 1-1 did not prevent this violation. In the second instance, refueling outage
clearances
were not approved by the shift foreman, as required by administrative
procedures.
Furthermore, the shift foreman's clearance
approval authority was delegated
to another senior reactor operator without documenting the delegation as required by
administrative procedures.
Consequently,
approvals for clearance activities were routinely
executed by an unauthorized person.
These violations are cited in the enclosed Notice of Violation (Notice), and the
circumstances
surrounding the violations are described
in detail in the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response'.
The NRC will
use your response,
in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter,
its enclosure(s),
and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response
should not include any personal privacy,
proprietary, or safeguards
information so that it can be placed in the PDR without redaction.
9609240246
960919
IIIIDCICK 05000275
8
Gregory M. Rueger
~
Pacific Gas and Electric Co.
-2-
. Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
J. E. Dyer, Director
Division of Reactor Projects
Docket Nos.:
50-275
50-323
License Nos:
DPR-82
Enclosures:
2.
NRC Inspection Report
50-275/96-1 9; 50-323/96-1 9
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
1'100 11th Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns<Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Gregory M. Rueger
Pacific Gas and Electric Co.
-3-
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Robert P, Powers, Vice President
and Plant Manager
Diablo Canyon'Power Plant
P.O. Box 56
~
~
Avila Beach, California 93424
Gregory IVI. Rueger
Pacific Gas and Electric Co.
4
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
R. Wise
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
G. F. Sanborn
DOCUMENT NAME: R: DciDC619RP.WFS
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" =
Copy with enclosures "N" = No copy
RIV:SRI'DR /P
WFSmith, .
09/ "/96
C:DRP/E.,
DD:DRP
D:DRP
FRHuey
KEPerkin
0
'/96
JEDyer I
~ f-,
09/ l/96
09
96
P<'FFICIAL RECORD COPY
09/ /96
Gregory M. Rueger
Pacific Gas and Electric Co.
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
, 'cc to DMB (IE01)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
R. Wise
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
G. F. Sanborn
DOCUMENT NAME: R: DciDC619RP.WFS
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" =
Copy with enclosures "N" = No copy
RIV:SRI:DRP/D
WFSmith <.',~" ~
09/'-/96
-<<" ....I'-
':DRP/E,.
FRHuey
1
09:]96
I
4'D:DRP
KEPerkin
6 /,'/96
D:DRP
JEDyer
<
'9/'96
09/ /96
OFFICIAL RECORD COPY
0
~l
1
I
.1
~