ML16342D408
| ML16342D408 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/14/1996 |
| From: | Steven Bloom NRC (Affiliation Not Assigned) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| References | |
| IEB-96-001, IEB-96-1, TAC-M95047, TAC-M95048, NUDOCS 9608160244 | |
| Download: ML16342D408 (4) | |
Text
August 14, 1996 Hr. Gregory H. Rueger Pacific Gas and Electric Company NPG Mail Code A10D P. 0.
Box 770000 San Francisco, California 94177
SUBJECT:
STATUS OF NRC REVIEW OF RESPONSES TO NRC BULLETIN 96-01, "CONTROL ROD INSERTION PROBLEMS" (TAC NOS.
H95047 AND H95048)
Dear Mr. Rueger:
Thank you for your responses to NRC Bulletin 96-01, "Control Rod Insertion Problems,"
dated April 5,
- 1996, and June 26, 1996, for the Diablo Canyon Nuclear Power Plant.
The NRC staff is currently evaluating the responses from all Westinghouse plants and is following the fuel testing and inspection activities being conducted by Westinghouse at selected plants.
We look forward to receiving the results of the inspection and testing activities at your site during the 1996 calendar year.
Should we identify any questions or concerns regarding either your planned inspection and testing activities or the results from these activities, we will contact you.
In addition, if over the next several
- months, you obtain information that was not specifically requested in the Bulletin but that may be of use to the NRC staff in assessing the operability of control rods, we would appreciate your sharing this information with us.
If you have any questions, please contact Margaret Chatterton at (301) 415-2889, Larry Kopp at (301) 415-2879, or Kris Thomas at (301) 415-1362.
Sincerely, Original Signed By Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
50-275 and 50-323 cc:
See next page DOCUMENT NAME:
DC95047.LTR DISTRIBUTION:
LDocket File I
PUBLIC PDIV-2 Reading JRoe EGAl WBateman EPeyton SBloom
- JDyer, RIV
- KPerkins, WCFO HChatterton, SRXB
- LKopp, SRXB KThomas OFC PDIV-2/LA PDIV-2/PM NAME EtIeeyen SB oom:ye DATE 8/I I/96 8/If/96 0
C A R
CORD OP 9608i 60244
'9I'60814 PDR ADQCK 05000275 G
1 4 ~
4I P
I s ~
Mr. Gregory M. Rueger August 14, 1996
.CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.
O.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion.
611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J.
- Warner, Esq.
Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. Robert P.
Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P'."0;" Box 56 Avila Beach, California 93424
4 N
I