ML16342D391

From kanterella
Jump to navigation Jump to search
Informs Staff of 960909-12 Meeting Re Osre Program Review to Evaluate Response of Security Staff to an External Threat
ML16342D391
Person / Time
Site: Diablo Canyon  
Issue date: 07/31/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9608060028
Download: ML16342D391 (10)


Text

0 UNITED STATES O

NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 AR LINGTON, TEXAS 76011 8064 JUL 3 I

!996 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation.

B14A 77 Beale Street, Room 1451 P.O.

Box 770000 San Francisco.

California 94177

Dear Hr. Rueger:

SUBJECT:

OPERATIONAI SAFEGUARDS

RESPONSE

EVALUATIONS The purpose of this letter is to confirm telephone discussions that involved representatives from the Office of Nuclear Regulation, Region IV, and your staff in regards to the Operational Safeguards

Response

Evaluation (OSRE) scheduled to be conducted September 9-12, 1996, at Diablo Canyon Nuclear Power Plant, Units 1 and 2.

A general review of the OSRE program and interactions with your staff are also discussed.

The primary objective of the OSRE program is to evaluate the response of your security staff to an external threat.

An OSRE team includes a nuclear system

engineer, reactor safeguards specialists.

and at least two NRC contractors.

Additional support is also provided by a Region IV safeguards inspector The resident inspectors may also observe or participate with the team.

An important aspect of the OSRE program is to observe the priorities established by your operations and security departments for the protection of plant equipment and the defensive strategies employed.

An overview of the planned OSRE activities will be presented at the entrance meeting which will be conducted when the team arrives on site.

This meeting will provide an opportunity for you to ask questions or request clarification of the OSRE objectives.

After the entrance

meeting, the team plans to take a

general orientation tour of the protected area perimeter.

Following the orientation tour, the team will meet with representatives from your security.

operations.

and engineering departments to select and walk down potential target sets to be used in'the security response drills and table-top exercises.

Following the selection of target sets, the team will conduct several table-top exercises involving your security response team leaders.

The OSRE team will observe your security force during response drills, which should be performed using normal drill procedures and participants.

The OSRE team's participation concerning the drills will only involve the selection of scenarios and the observation of drills conducted by your security organization.

9h080h0028 9b073i PDR ADCICK 05000275" F

PDR

'l

'I

Pacific Gas and Electric Company The nuclear systems engineer will need to interface with your operations staff to ensure that planned OSRE activities do not interfere with safe operation of the reactors.

The team will schedule its activities so as to avoid the disruption of normal plan operations.

The team also plans to interview the security officers during weapons familiarity and proficiency activities.

The time that various team members plan to spend on site may vary. but generally will range between 6-8 hours per day.

Some of this time is expected to be during evening hours.

If you have any questions regarding the conduct of the OSRE program that need to be answered before the entrance meeting,"please call David Orrik at 301/415-3213 or Blaine Murray at 817/860-8126.

Sincerely.

orna w

, Director ivisie of eactor Safety Docket Nos.:

50-275 50-323 License Nos.:

DPR-80 DPR-82 CC:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, Cali forni a 95814 Ms.

Nancy Culver San Luis Obispo Mothers for Peace P.O.

Box 164 Pismo Beach. California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach. California 93448 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406

l fi

Pacific Gas and Electric Company Chairman San Luis Obispo County Board of Supervisors Room 370

'ounty Government Center San Luis Obispo, California 93408 Mr. Truman BurnshMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm.

4102 San Francisco, Cali fornia 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street.

Suite D

Monterey. California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O.

Box 942732 Sacramento, California 94234 Peter H. Kaufman, Deputy Attorney General State of California 110 West A Street.

Suite 700 San Diego. Cali fornia 92101 Christopher J.

Warner, Esq.

Pacific Gas and Electric Company P.O.

Box 7442 San Francisco, California 94120 Warren H. Fujimoto, Vice President and Plant Manager Pacific Gas and Electric Company Diablo Canyon Power Plant P.O.

Box 56 Avila Beach, California 93424

rJ

<I

Pacific Gas and Electric Company bcc to DMB (IEOl) bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E.

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

E.

Adensam, NRR S.
Bloom, PM, NRR D. Orrik, NRR Resident Inspector DRS-PSB MIS System RIV File M.

Hammond (PAO, WCFO)

B. Grimes, NRR Cunningham, NRR M. Tschiltz, SRI DOCUMENT NAME:

G:NOSREDC.BM To receive copy of document, Indlcat in box: "C""-Copy without enciosures "E" ~ Copy with encjosures "N" -" No copy C:PSB E

D:DR N

BMurray:cg 07P

/96 TPGwynn 07/

/96

'I

Pacific Gas and Electric Company bcc to DMB (IE01) bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E.

WCFO)

Senior Project Inspector (DRP/ED WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB.

MS:

TWFN 9E10)

E.

Adensam, NRR S.
Bloom, PM, NRR D. Orrik, NRR Resident Inspector DRS-PSB MIS System RIV File M.

Hammond (PAO, WCFO)

B. Grimes, NRR L. Cunningham, NRR M. Tschi ltz, SRI DOCUMENT NAME:

G:NOSREDC.BM To receive copy of document, Indlcat In box: "C" -" Copy without enciosures "E" ~ Copy with enciosures "N" = No copy C:PSB BMurray:cg 07

/96 E

D:DR N

TPGwynn 07/

/96

0