ML16342D358

From kanterella
Jump to navigation Jump to search
Informs That Changes Submitted in Re Emergency Plan,Rev 3,Change 15 to Plant NPP Plan Acceptable & Do Not Appear to Degrade Effectiveness of Emergency Planning at Plant
ML16342D358
Person / Time
Site: Diablo Canyon  
Issue date: 07/08/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9607120036
Download: ML16342D358 (10)


Text

gR ~~Cyc

> +c 0

I '~

(<PAL oo

+**4+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 JUL -8 S96 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451

.P.O.

Box 770000 San Francisco, Cali fornia 94177

SUBJECT:

DIABLO CANYON UNITS 1

AND 2, EMERGENCY PLAN, REVISION 3.

CHANGE 15 We have received your letter dated April 16, 1996, File:

PG&E Letter DCL-96-096,

Subject:

Emergency

Plan, Revision 3, Change 15, which transmitted Revision 3

~ Change

15. to the Diablo Canyon Nuclear Power Plant Emergency Plan.

This revision was submitted pursuant to 10 CFR 50.54(q) and incorporated the following changes:

(1) plant staff organization

changes, (2) emergency response organization
changes, (3) changes in methods for staffing and operating emergency response facilities, (4) emergency action level changes, and (5) administrative changes.

This also refers to telephonic discussion of the changes between Messrs.

A. McQueen of Region IV and R. Bliss of the Diablo Canyon Nuclear Power Plant emergency planning staff on June 26, 1996.

Our review determined that the changes are acceptable and do not appear to degrade the effectiveness of your emergency planning at the Diablo Canyon Nuclear Power Plant.

Should you have any questions concerning this letter, please contact Mr. Arthur D.

McQueen at (510) 975-0241.

Sincerely, Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 T

mas P.

irector ivision of eactor Safety

'P607i20036 960708 PDR ADCICK 05000275 F

PDR

Pacific Gas and Electric Company CC:

Dr. Richard Ferguson Energy Chair, Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms.

Nancy Culver San Luis Obispo Mothers for Peace P.O.

Box 164 Pismo Beach. Chlifornia 93448

's.

Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448 Managing Editor The County Telegram Tribune 1321 Johnson Avenue

'.O.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisor s Room 370 County,.Government Center San Luis Obispo, California 93408 Mr. Truman BurnsNMr. Robert Kinosian California Public Utili,ties Commission 505 Van Ness, Rm.

4102 San Francisco, Cali fornia 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D

Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O.

Box 942732 Sacramento, California 94234

A

Pacific Gas and Electric Company Peter H. Kaufman.

Deputy Attorney General State of California 110 West A Street.

Suite 700 San Diego, Cali fornia 92101 Christopher J.

Warner, Esq.

Pacific Gas and Electric Company P.O.

Box 7442 San Francisco.

California 94120 Warren H. Fujimoto, Vice President and Plant Manager Pacific Gas and Electric Company Diablo Canyon Power Plant P.O.

Box 56 Avila Beach. California 93424

0

Pacific Gas and Electric Company E-Hail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Michael Davis (NDl) bcc to DHB (IE35) bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chiet (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File

- M.

Hammond (PAO, WCFO)

NRR Project Manager 4)g5 Plp DIDO DOCUMENT NAME:

G:XDRSLTRSNDCEPLNL3.ADM To receive copy or document, Indicate in box: "C" = Copy without enciosures "E" "- Copy with enclosures "N" = No copy PSB E

ADMcQueen:vh 07

. /96 C:PSB E

BMurray 07 796 D:DRS N

TPGwynn 07/

07/

/96 07/

/96

'I

Pacific Gas and Electric Company E-Mail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

E-Hail report to Michael Davis (MJD1)

,bcc to DMB (IE35) i 0 bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector DRS-PSB HIS System RIV File M.

Hammond (PAO, WCFO)

NRR Project Manager 4)g5 PCp 8

oPPo DOCUMENT NAME:

G:KDRSLTRSNDCEPLNL3.ADH To receive copy of document, Indicate In box: "C" = Copy, without enclosures "E" ~ Copy with enciosures "N" = No copy PSB E

ADHcQueen:vh 07

. /96 C:PSB E

BHurray 07 V96 D:DRS N

TPGwynn 07/

07/

/96 07/

/96 r)r ~A

>