ML16342D335

From kanterella
Jump to navigation Jump to search
Responds to Request for Statistics on Allegations Re Plant Which Had Been Made During Conversation W/E Baker at Mar 1996 Employee Concerns Conference.Table W/Breakdown of Allegations,Encl
ML16342D335
Person / Time
Site: Diablo Canyon  
Issue date: 06/11/1996
From: Steven Bloom
NRC (Affiliation Not Assigned)
To: Stetson D
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9606200042
Download: ML16342D335 (8)


Text

June 11, i996 Mr. Dave Stetson Pacific Gas

& Electric Company Diablo Canyon PP Employee Concerns Program P.O.

Box 56 Avila Beach, CA 93424

Dear Hr. Stetson:

This letter is in response to your request for statistics on allegations concerning the Diablo Canyon Power Plant which you made during a conversation with Mr. Edward T. Baker, NRC's Agency Allegation Advisor, at the March 1996 Employee Concerns Conference.

The attached table provides a breakdown of the allegations received in calendar years

1993, 1994, and
1995, and this year through Hay 22, 1996.

If you have any questions concerning the data, please contact Mr. Baker.

He can be reached at (301) 415-8529.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-275 and 50-323

Enclosure:

Table cc w/encl:

See next page

'ISTRIBUTION:

Docket Fi1 e PUBLIC PDIV-2 Reading

., JRoe EGAl WBateman JDyer,'IV

SBloom EPeyton EBaker

RWise, RIV OGC JLee DOCUMENT NAME:

BAKER OFC PDIV-2 LA NAME 8eeRn DATE 6

I1 96 P

V-2 PH oom:ye 6

96 OFFICIAL RECORD COPY

(-

=9bob200042 05000275 qbobi~

pop ADQCK pop p

Pmg Pg,K CKMRIa +>>

r f

t.

)t c

If ll IB 1

t I<

3une 11, 1996 Hr. Dave Stetson Pacific Gas

& Electric Company Diablo Canyon PP Employee Concerns Program P.O.

Box 56 Avila Beach, CA 93424

Dear Hr. Stetson:

This letter is in response to your request for statistics on allegations concerning the Diablo Canyon Power Plant which you made during a conversation with Hr. Edward T. Baker, NRC's Agency Allegation Advisor, at the March 1996 Employee Concerns Conference.

The attached table provides a breakdown of the allegations received in calendar years

1993, 1994, and 1995, and this year through Hay 22, 1996.

If you have any questions concerning the data, please contact Mr. Baker.

He can be reached at (301) 415-8529.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-275 and 50-323

Enclosure:

Table cc w/encl:

See next page QIETRIBUTI II:

Docket File PUBLIC POIV-2 Reading JRoe EGAl WBateman

JDyer, RIV SBloom EPeyton EBaker
RWise, RIV OGC JLee DOCUMENT NAME:

BAKER P

V-2 PM OFC PDIV-2 LA e

n oom:ye DATE 6 Il 96 6

96 OFFICIAL RECORD COPY

~

1

~

~

t

Hr. Gregory H. Rueger cc w/encl:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Hs.

Nancy Culver San Luis Obispo Mothers for Peace P. 0.

Box 164 Pismo Beach, California 93448 Hs. Jacquelyn C. Wheeler P. 0.

Box 164 Pismo Beach, California 93448 Managing Editor he Count e

e r m Tr'bune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Hr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Regional Administrator, Region IV U.S. Nucle'ar Regulatory Commission Harris Tower 5 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J. Warner, Esq.

Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Hr. Warren H. Fujimoto Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. 0.

Box 56 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940

J

~

~

DIABLO CANYON ALLEGATIONS Received HKI Substantiated Still 0 en Licensee Em lo ee 1993 Contractor Em lo ee Private Citizen Licensee Other Received H8.I Substantiated Still 0 en Licensee Em loyee 1994 Contractor Em loyee 2

Private Citizen Licensee Other Received H&I Substantiated Still 0 en 1995 Licensee Contractor Em lo ee Em loyee 0

0 0

0 Private Citizen Licensee Other Received HEI Substantiated Still 0 en Licensee Em lo ee 1996 Contractor Em lo ee Private Citizen Licensee Other

1

'e

't IIr S

1