ML16342D303
| ML16342D303 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/20/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342D304 | List: |
| References | |
| NUDOCS 9605280208 | |
| Download: ML16342D303 (6) | |
See also: IR 05000275/1996006
Text
AS RKGIp,
Ip
~4
0~i
nO
+**++
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLA2A DRIVE, SUITE 400
ARLINGTON,TEXAS 760114064
Hay 20,
1996
Hr. Gregory H. Rueger,
Senior Vice President
and
General
Hanager
Nuclear
Power Generation
Bus. Unit
Pacific Gas
and Electric
COI ~any
Nuclear
Power Generation,
B14A
77 Beale Street,
~ Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/96-06;
50-323/96-06
AND
Dear Hr. Rueger:
On April 13,
1996,
the
NRC completed
an inspection at your Diablo Canyon
1
8
2
reactor facilities.
The enclosed
report presents
the results of that
inspection.
During the 6-week period covered
by this inspection period, your conduct of
activities at the Diablo Canyon facilities was generally characterized
by
safety-conscious
operations
and
sound engineering
and maintenance
practices.
Two violations were identified by the
NRC inspectors.
We are concerned
with
recent operations
performance
related
to operator failures to verify safety-
related
instrumentation
through channel
checks
required
by Technical
Specifications
and their failure to adhere to procedures
during the Unit
1
restart
process.
We are also concerned
with engineering
performance
related to assuring that
the
FSAR is updated
to be consistent
with plant conditions
and current
practices
and to assuring that changes
are appropriately evaluated.
We note
that subsequent
to inspector findings in this area
you have initiated aetio
s
to review the accuracy of the
FSAR and have identified
a number of
discrepancies
which require additional licensee
and
NRC review.
We request
that you provide
a response
describing your
FSAR review efforts
and the
results
obtained
thus far so that
we may resolve this matter.
The violations are cited in the enclosed
Notice of Violation, and the
circumstances
surrounding
the violations are described
in detail in the
enclosed
report.
Please
note that you are required to respond
to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your response,
in part, to
determine
whether further enforcement
action is necessary
to ensure
compliance
with regulatory requirements.
9605280208
960520
ADOCK 05000275
8
Pacific
Gas
and Electric Company
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed
in the
NRC Public Document
Room.
Dockets:
50-275
50-323
Licenses:
DPR-82
Enclosures:
1.
2.
NRC Inspection
Report
50-275/96-06;
50-323/96-06
cc w/enclosure:
Sierra
Club California
ATTN:
Dr. Richard Ferguson
Energy Chair
1100 11th Street,
Suite
311
Sacramento,
95814
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
P.O.
Box 164
Pismo Beach, California
93448
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
Sincerely,
J.
E. Dyer, Director
Division of Reactor Projects
Pacific
Gas
and Electric Company
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety
Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Pacific
Gas
and Electric Company
Diablo Canyon
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific Gas
and Electric Company
E-Hail,report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
H.
Hammond
(PAO,
WCFO)
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
DOCUMENT NAME:
To receive copy of document, indicate in box:
C
~ Copy without enclosures
"E" ~ Copy with enclosures
N- ~ No copy
RIV:DRP/E
E
C:DRP/E
E
D:DRP
HDTchiltz
05/1 /96
HJWon
05/~/96
JEDyer
05/
/96
05/
/96
05/
/96
Pacific
Gas
and Electric Company
0
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bc', to, DMB,=(IEOl.)
r
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
M.
Hammond
(PAO,
WCFO)
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
DOCUMENT NAME:
To receive copy of document, indicete in boxr "C" ~ Copy without enciosures
"E" i Copy with enclosures "N" ~ No copy
RIV:DRP/E
E
MDTchiltz
05/I /96
C:DRP/E
E
HJWon
05/~/96
D:DRP
JEDyer
05/
/96
05/
/96
05/
/96
A
H
('v
A
"asm; ~ r