ML16342D297
| ML16342D297 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/21/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342D298 | List: |
| References | |
| NUDOCS 9605230219 | |
| Download: ML16342D297 (10) | |
See also: IR 05000275/1996007
Text
~PS 4EgI
4
Wp0
+~~g4
UNITED STATES
NUCLEAR REGULATORY'COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
MI p> S96
Pacific Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
N. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street.
Room
1451
P.O.
Box 770000
San Francisco.
94177
SUBJECT:
NRC
INSPECTION REPORT 50-275/96-07:
50-323/96-07
This refers to the inspection conducted
by Messrs.
L. T. Ricketson
and
G.
L. Guerra of this office on April 15-19,
1996, at the Diablo Canyon Nuclear
Power Plant, Units
1 and 2, facility.
The purpose of the inspection
was to
determine whether activities authorized
by the license were conducted safely
and in accordance
with NRC requirements.
At the conclusion of the inspections
the findings were discussed
with you and those
members of your staff
identified in the enclosed
report.
A followup discussion
was also conducted
on Hay 16,
1996, 'to discuss
issues
presented
during the inspection exit meeting.
During this discussion,
your
staff stated,
and assured
the
NRC, that
a change in environmental
monitoring
station locations could not be performed without a review of the commitments
in the Diablo Canyon Final Safety Analysis Report.
As
a result of this
discussion,
we determined that there
was no violation associated
with the
matter discussed
in Section
3. 1 of the enclosed
inspection report.
Areas examined during the inspection are identified in the'eport.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel.
and observation of
activities in progress.
The results of this inspection are documented
in the
enclosed
report.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection.
we will be pleased
to discuss
them with you.
Sincerely.
pl wc-M
-Z T omas
P. wy,
irector
ivisi on of Reactor
Sa fety
96052302i9 96052l
ADOCK 05000275
8
Pacific Gas
and Electric Company
-2-
Dockets:
50-275
50-323
Licenses:
DPR-82
Enclosure:
NRC Inspection
Report
50-275/96-07:
50-323/96-07
w/attachments
cc w/enclosure:
ATTN:
Dr. Richard Ferguson
Energy Chair
'100
11th Street,
Suite
311
Sacramento.
95814
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
P.O.
Box 164
Pismo Beach. California
93448
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo. California
93408
California Public Utilities Commission-
ATTN:
Mr. Truman BurnsNMr. Robert Kinosian
505 Van Ness.
Rm.
4102
San Francisco.
Cali fornia
94102
0
Pacific Gas
and Electric Company
-3-
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington.
Esq.
Legal
Counsel
857 Cass Street.
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Hr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Hr. Peter
H. Kaufman
Deputy Attorney General
110 West A Streets
Suite 700
San Diego. Cali fornia
92101
Pacific Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Pacific Gas
and Electric Company
Diablo Canyon
Power Plant
ATTN:
Warren
H. Fujimoto. Vice President
and Plant Hanager
P.O.
Box 56
Avila Beach, California
93424
Pacific Gas
and Electric Company
E-Hail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
E-Mail report to H. Davis
(MJD1)
NRR Inspection
Program Branch
(PIPB)
bcc to
DMB (IE06)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
MIS System
RIV File
M.
Haranond
(PAO,
WCFO)
DOCUMENT NAME:
'R:NDC9607RP.LTR
To receive copy of document. indicete in hoon "C"
Copy without enctosu
"E"
Copy with enclosutes "N"
No copy
SRS:PSB
E
RS:PSB
E
C:P
B
E
D:DRS
N
nn
/'5/
-/96
ur
05/
/96
05/
/96
05/CL /96
D:DR
TPGwynn .~
05/>'It/96 4
FFI IAL RE
RD
PY
LTRicketson:c t'LGuerra
L.b
PBE:DRP
E
HWon
05/
/96
Pacific Gas
and Electric Company
-4-
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(,IPAS)
E-Mail report to H. Davis
(HJD1)
NRR Inspection
Program Branch
(PIPB)
bcc to
DMB (tE06)<y~
bcc distrib.
by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E.
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB',
HS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
MIS System
RIV File
M. Haranond
(PAO,
WCFO)
DOCUMENT NAME:
R:XDC9607RP.LTR
yo receive copy of docmnent, indicete in hox: "C" - Copy without enclosu
"E - Copy with enclosures "N"
No copy
SRS:PSB
E
LTRicketson:c 4"
RS:PSB
E
GLGuerra
nn
HWon
ur
C:P
B
E
D:DRS
N
PBE:DRP
E
05/
/96
D:DR
TPGwynn
05/>~/96
,
05/
/96
05/6 /96
05/ -/96
FFI IAL RE
RD
PY
05/F /96
,r