CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9602010026
DOC.DATE:'96/Ol/22
NOTARIZED: NO
DOCKET
g.
ACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo'anyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
.
AUTHOR AFFILIATION
DYER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.'acific Gas
& Electric Co.
SUBJECT:
Ack receipt of 951221 ltr informing NRC of steps
taken to
correct violations noted in insp repts
50-275/95-15
&
50-323/95-15.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi lation. esponse
NOTES:
INTERNAL:
RECIPIENT
ID CODE/NAME
PD4-2
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
RECIPIENT
ID CODE/NAME
'LOOMiS
AEOD/DEIB
AEO+D~TC-.
FILE CENTE
RR DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
EXTERNAL: LITCO BRYCE,J
H
NRC
NOAC
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
O
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
0'
i'
~p,g IIEcy,
Mp0
ly
C
o
Cy
+a*++
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE,SUITE 400
ARLINGTON,TEXAS 76011.8064
January
22,
1996
Pacific Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory H. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
7? Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
9417?
SUBJECT:
NRC
INSPECTION REPORT 50-275/95-15;
50-323/95-15
Thank you for your letter of December
21,
1995, in response
to our
letter
and Notice of Violation dated
November 22,
1995.
We have reviewed your
reply and find it responsive
to the concerns
raised in our Notice of
Violation.
We will review the implementation of your corrective actions
during
a future inspection to determine that full compliance
has
been
achieved
and will be maintained.
Sincerely,
Dockets:
50-275
50-323
Licenses:
DPR-82
J.
E. Dyer
Director
Division of Reactor Projects
CC:
Sier'ra Club California
ATTN:
Dr. Richard Ferguson
Energy Chair
1100 11th Street,
Suite
311
Sacramento,
95814
9602010026
960i22
ADQCK 05000275
8
Pacific Gas
and Electric Company
San Luis Obispo
Mothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo Beach, California
93448
Hs. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN: " Chairman
Room 370
County Government Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Hr. Truman Burns(Hr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
Cali'fornia
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Hr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Hr. Peter
H. Kaufman
Deputy Attorney General
110 West A Street,
Suite
700
San Diego, California
92101
Pacific Gas
and Electric Company
-3-
Pacific Gas
and Electric Company
ATTN:
Christopher J. Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Pacific
Gas
and Electric Company
Diablo Canyon
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
DRS'cc
distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
H.
Hammond
(PAO,
WCFO)
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief
(DRP/TSS)'eah
Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
DOCUHENT NAHE:
To receive copy of document, indicate in box: "C" = Copy without enctosures
"E
~-Copy with enclosures "N" ~ No copy
RIV:C: DRPtt E
HJWong
Ol// /96
D:WCFO
KEPerkins
Ol/A+96
D DRP
JEDyer
01/
/96
01/
/96
01/
/96
8 ~
4
Pacific
Gas
and Ele'ctric Company
E-Hail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
~bcc to
DHB (IEOl) DRB
y0
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
H.
Hammond
(PAO,
WCFO)
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
DOCUMENT NAME:
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV:C:DRP
E
HJWong
01// /96
D:WCFO
KEPerkins
Ol/A+96
D:DRP
JEDyer
01/
/96
01/
/96
01/
/96
i
0