Forwards Insp Repts 50-275/95-16 & 50-323/95-16 on 951029-1209 & Notice of Violation.Violation Involved Failure of Personnel to Follow Procedures
ML16342D176
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/16/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D177 List:
References
NUDOCS 9601190422
Download: ML16342D176 (12)


See also: IR 05000275/1995016

Text

4ax QeVt.ii

c

j

REGULATO

INFORMATION DISTRIBUTION

TEM (RIDS)

-ACCESSION NBR:9601190422

DOC.DATE: 96/Ol/16

NOTARIZED: NO

DOCKET

CIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

DYERgJ.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERiG.M.

Pacific Gas

6 Electric Co.

I

SUBJECT:

Forwards insp repts

50-275/95-16

6 50-323/95-16

on

951029-1209

& notice of violation.Violation involved failure

of personnel

to follow procedures.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation

esponse

NOTES:

INTERNAL:

'RECIPIENT

ID CODE/NAME

PD4-2

PD

ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

~

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOMiS

AEOD/DEIB

ou/~

'ENTER~

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

l

1

1

1

1

1

1

1

1

1

1

EXTERNAL

LITCO BRYCEIJ

H

NRC

PDR

.

1

1

NOAC

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US

TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKS

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF 'COPIES

REQUIRED:

LTTR

20

ENCL

20

RECuc

Wp0

g

+w*e+

UNITED STATES

UCLEAR REGULATORY COMMISS

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

JAN

f 6 l996

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-16;

50-323/95-16

AND NOTICE OF

VIOLATION

This refers to the inspection

conducted

by J. Dixon-Herrity, J.Russell,

and

S.

Boynton of this office on October

29,

1995 through

December

9,

1995, at the

Diablo Canyon Nuclear

Power Plant,

Units

1 and 2, facility.

The purpose of

the inspection

was to determine

whether activities authorized

by the license

were conducted safely

and in accordance

with NRC requirements.

At the conclu-

sion of the inspection,

the findings were discussed

with those

members of your

staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

The results of this inspection

are documented

in the

enclosed

report.

Based

on the results of this inspection,

the

NRC has determined that two

violations of NRC requirements

occurred.

The violations are cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding

them

are described

in detail in the subject inspection report.

The violations are

of concern,

because

they provide further examples of the failure of personnel

to follow procedures.

The first violation involves

an operator failure to

follow procedures

during

a reactor coolant

system draindown.

The second

violation involves operators

and maintenance

technicians failure to follow

procedures

(or make changes

to the procedures)

during testing of source

range

nuclear instruments.

The third violation involves the failure of cleaning

personnel

to follow procedures

to notify personnel

of a blocked fire door in

a

diesel

generator

room.

The violations indicate that continued effort is

needed

to assure

the corrective actions

taken after the Unit

1 transformer

fire are fully effective.

You are required to respond to this letter and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous

docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

960ii90422 960ii6

PDR

ADQCK 05000275

8

PDR

t

Pacific

Gas

and Electric Company

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter, its enclosure(s),

and your response will be placed in the

NRC

Public Document

Room

(PDR).

To the extent possible,

your response

should not

include

any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed

in the

PDR without reduction.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and

Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

J.

E. Dyer

Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-275/95-16;

50-323/95-16

cc w/enclosures:

Sierra

Cl'ub California

ATTN:

Dr. Richard

Ferguson

Energy Chair

1100 11th Street,

Suite

311

Sacramento,

California

95814

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

I

Pacific

Gas

and Electric Company

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns)Nr.

Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Hr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Hr.. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Pacific

Gas

and Electric Company

Pacific

Gas

and Electric Company

Diablo Canyon

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

t

Pacific Gas

and Electric Company

JAN

I 6 l996

E-Mail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB

( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRS-PSB

Branch Chief (DRP/E,

WCFO)

RIV Fi1 e

M.

Hammond

(PAO,

WCFO)

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

DOCUMENT NAME:

R:tt DCiDC516RP.JLD

To receive copy cf document, indicate in bore "C" ~ Copy without enclosures

"E" ~ Copy with enclosures

"N" = No copy

RIV:DRP/E

E

C:DRP/E

E

JDixon-Herrity*

HJWon *

D:WCFO

KEPerkins*

D:DRP

JDyer

3 i=L7

I/?/96 by

DEC

1/4/96 / I

c,

I/O/96

I//

96

  • previous y concurre