Reviews 951101 Submittal Re Augmented Testing & Inspection Program for Plant Main Steam Safety Valves.Forwards SE, Providing Results of Review.Determines Program Acceptable
ML16342D149
Person / Time
Site: Diablo Canyon  
Issue date: 12/26/1995
From: Steven Bloom
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D150 List:
References
TAC-M94023, TAC-M94024, NUDOCS 9512280282
Download: ML16342D149 (6)


Text

Hr. Gregory H. Rueger Pacific Gas and Electric Company NPG Hail Code A10D P. 0.

Box 770000 San Francisco, California 94177

.December 26, 1995 3

SUBJECT:

EVALUATION OF HAIN STEAM SAFETY VALVE AUGMENTED TESTING AND INSPECTION PROGRAM FOR DIABLO CANYON POWER PLANT, UNITS 1

AND 2 (TAC NOS.

H94023 AND H94024)

Dear Hr. Rueger:

The NRC has reviewed your submittal dated November 1,

1995, related to an augmented testing and inspection program for the plant main steam safety valves.

The enclosed safety evaluation provides the results of our review.

Your program has been determined acceptable as proposed.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-275 and 50-323

Enclosure:

Safety Evaluation cc w/encl:

See next page DISTRIBUTION:

Docket File PUBLIC EAdensam JRoe WBateman SBloom EPeyton ACRS PDIV-2 Reading

OGC, 015B18
KPerkins, WCFO
JDyer, RIV GHammer DOCUMENT NAME: DC94023.LTR OFC PDIV-2/LA P IV- /PH NAME e

n c.pk DATE lW~/95 I ~/Zg/95 OFFICIAL RECORD COPY 95i2280282 95i22b PDR

.ADOCK 05000275 8

" ',n"'

PDR

'-!5' j i II

~( gg~,gr)rja QQI%'

0 1

p I

n l~l.O

'1

<<'0098z

Hr. Gregory M. Rueger Pacific Gas and Electric Company NPG Mail Code A10D P. 0.

Box 770000 San Francisco, California 94177 December 26, 1995

SUBJECT:

EVALUATION OF HAIN STEAM SAFETY VALVE AUGMENTED TESTING AND INSPECTION PROGRAM FOR DIABLO CANYON POWER PLANT, UNITS 1

AND 2'TAC NOS.

H94023

'AND H94024)

Dear Mr. Rueger:

The NRC has reviewed your submittal dated November 1,

1995, related to an augmented testing and inspection program for the plant main steam safety valves.

The enclosed safety evaluation provides the results of our review.

Your program has been determined acceptable as proposed.

Sincerely, Original signed by:

Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.

50-275 and 50-323

Enclosure:

Safety Evaluation cc w/encl:

See next page DISTR IBUTION:

Docket File PUBLIC EAdensam JRoe WBateman SBloom EPeyton ACRS PDIV-2 Reading

OGC, 015B18 KPer kins, WCFO
JDyer, RIV GHammer DOCUMENT NAME: DC94023.LTR OFC NAME DATE P IV- /PH PD IV-2/LA e

n

.pk ling&/95 I ~/24/95 OFFICIAL R CORD COPY

F t

P Nr. Gregory M. Rueger cc w/encl:

I NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ns.

Nancy Culver San Luis Obispo Mothers for Peace P. 0.

Box 164 Pismo Beach, California 93448 Ns. Jacquelyn C. Wheeler P. 0; Box 164 Pismo Beach, Ca1ifornia 93448 Managing Editor The Count Tele ram Tribune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Nr. Truman Burns Nr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Nr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Regional Administrator, Region IV U.S. Nuclear, Regulatory Commission Harris Tower

& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Christopher J. Warner, Esq.

Pacific Gas 3 Electric Company Post Office Box 7442 San Francisco, California 94120 Nr. Warren H. Fujimoto Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. 0.

Box 56 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940