Forwards Insp Repts 50-275/95-15 & 50-323/95-15 on 950915-1028 & Notice of Violation.Violation of NRC Concern Because Similar Condition Had Been Identified,But CA Had Not Been Implemented for Over Year
ML16342D128
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/22/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D129 List:
References
NUDOCS 9512050209
Download: ML16342D128 (12)


See also: IR 05000275/1995015

Text

J . LXL&l'LA J.

L

4

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

t- ACCESSION NBR:9512050209

DOC.DATE: 95/11/22

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILXATION

DYER,J.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERrG.M.

Pacific Gas

a Electric Co.

SUBJECT:

Forwards insp repts

50-275/95-15

a 50-323/95-15

on

950915-1028

6 notice of violation.Violation of NRC concern

because

similar condition had been identified,but

CA had

not been

implemented for over year.

DISTRIBUTXON CODE: IEOlD

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

DOCKET ¹

05000275

05000323

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPS

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCE,J

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECXPIENT

ID CODE/NAME

BLOOMrS

AEOD/DEIB

AEOD/TTC,

~FIGE CENTER

KRW+DRCH HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCONTROL

DESK, ROOM P 1-37 (EXT. 504-2083 ) TO EL!MINATE YOUR NAME PROD!

DISTRIBUTIOYLISTS I'OR DOCUNIENTS YOU DON'TNEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

e

~gg IIEQgg~

(4

fp

~4

O

Cy

n0

X

IA

O~

++*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 760114064

NOV

2 2 1995

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory H. Rueger,

Senior Vice

President

and General

Nanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-15;

50-323/95-15

AND NOTICE OF

VIOLATION

I

This refers to the inspection

conducted

by J. Russell,

S.

Boynton,

and

D. Acker of this office on September

15 through October

28,

1995, at the

Diablo Canyon Nuclear

Power Plant, Units

1 and 2, facility.

The purpose of

the inspection

was to determine whether activities authorized

by the license

were conducted safely

and in accordance

with NRC requirements.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report. 'ithin

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed

report.

Based

on the results of this inspection,

the

NRC has determined that one cited

and four non-cited violations of NRC requirements

occurred.

The violation is

cited in the enclosed

Notice of Violation (Notice)

and the circumstances

surrounding it are described

in detail in the subject

inspection report.

The

cited violation, performing core alterations without containment closure,

is

of concern

because

a similar condition had

been identified, but corrective

actions

had not been

implemented for over

a year.

The non-cited violations in the radiological protection

area

are of concern

because

they each involve

a failure to follow established

procedures.

While

each is considered

individually of low safety significance

and they involved

different radiological protection procedures,

they indicate

a weakness

in

individual's attention to detail in performance of work activities.

During this inspection period,

a personnel

error resulted

in a

16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> loss of

offsite power to Unit 1, which was

shutdown at the time.

This will be the

subject of a special

inspection

(275/95-17).

9'5i2050209 '75ii22.

PDR

ADDCK 05000275

8

PDR

/

0

Pacific Gas

and Electric Company

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and

any additional

actions

you plan .to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosure(s),

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible,

your response

should not

include any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed in the'DR without reduction.

The responses

directed

by this letter and the enclosed

Notice are not subject

.

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.5ll.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

J.

E. Dyer, Director

Division of Reactor Projects

Enclosures':

1.

Notice of Violation

2.

NRC Inspection

Report

50-275/95-15;

50-323/95-15

cc w/enclosures:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

1100 11th Street,

Suite

311

Sacramento,

California

95814

r

Pacific Gas

and Electric Company

San Luis Obispo

Mothers for Peace

ATTN:

Ms. Nancy Culver

P.O.

Box 164

Pismo Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns(Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington, Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr, Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

r,

C'acific Gas

and Electric Company

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

r

Pacific

Gas 'and Electric Company

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

Resident

Inspector

DRSS- F IPB

MIS System

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

To receive copy of document, indicate in bo

" = Copy withou enclosures

"E" ~ Copy with enclosures "N" ~ No copy

C:DRP/E

HWon

11++9

D:WCFO

KPer kin

11

95

D:DRP

JDyer

ll/

95

0

CALR

0

60r3Cr 3. Cj

go/