Forwards Insp Repts 50-275/95-14 & 50-323/95-14 on 950806-0916 & Nov.Violation of Concern Because It Involves Establishment of Inappropriate Conditions Prior to Surveillance Testing
ML16342D107
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/27/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D108 List:
References
NUDOCS 9511060334
Download: ML16342D107 (8)


See also: IR 05000275/1995014

Text

~j.~EC.X J

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

!>ACCESSION NBR:9511060334

DOC.DATE: 95/10/27

NOTARIZED:

NO

'OCKET 4

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

DYER,J.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERiG.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts

50-275/95-14

6 50-323/95-14

on

950806-0916

a NOV.Violation of concern

because it involves

establishment

of inappropriate

conditions prior to

surveillance testing.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

'NRR/DISP/PIPB

NRR/DRPM/PDLR

NUDOCS-ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCE9J

H

NRC

PDR

COPIES

RECIPIENT

LTTR ENCL

ID CODE/NAME

1

1

BLOOM,S

2

AEOD/DEIB

1

AEOD TTC

1

&EBB CENTER~

1

R/DRCH/HHFB

1

NRR/DRPM/PECB

1

OE DIR

1

RGN4

FILE

01

1

1

NOAC

1

1

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVPSTE! CONTACTTHE DOCUMENTCONTROL

DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMIYATEYOUR Y'AMEFROil

DISTRIBUTIOY:LISTS FOR DOCUMENTS YOU DON'T NEED!

4

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

gy,6 REC0

P0

Cy

A.

0

lA

P r

/4l7 ++*++

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

October

27

1995

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory H. Rueger,

Senior Vice

President

and General

Hanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT'RC

INSPECTION

REPORT 50-275/95-14;

50-323/95-14

AND NOTICE OF

VIOLATION

This refers to the inspection

conducted

by H. Tschiltz,

and others, of this

office on August

6 through September

16,

1995, at the Diablo Canyon Nuclear

Power Plant, Units

1 and 2, facility.

The purpose of the inspection

was to

determine

whether activities authorized

by the license

were conducted

safely

and in accordance

with NRC requirements.

At the conclusion of the inspecti'on,

the findings were discussed

with those

members of your staff identified in the

enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

the

NRC has determined that two

violations of NRC requirements

occurred.

These violations are cited in the

enclosed

Notice of Violation (Notice)

an'd the circumstances

surrounding

them

are described

in detail in the subject

inspection report.

The first violation

is of concern in that it involves the establishment

of inappropriate

conditions prior to surveillance testing of an emergency diesel

generator.

The second viol.ation is of concern in that initial corrective actions to

resolve

an identified problem in the offsite power supply system

were

inappropriate.

We note that 'previous reviews of the issue

were based

on the

use of judgement rather than calculations

and that there were delays

in

recognizing

and addressing

the offsite power supply system

problem.

Both

violations were brought to your attention

by 'the

NRC.

You are required to respond

to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

yoII should

document the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

9511060334

951027

PDR

ADQCK 05000275

8

PDR

Pacific

Gas

and Electric Company

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a c'py of

this letter, its enclosure(s),

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible,

your response

should not

include

any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed in the

PDR without redaction.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Hanagement

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

J.

E. Dyer, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-275/95-14;

50-323/95-14

cc w/enclosures:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

."Energy Chair

1100 11th Street,

Suite

311

Sacramento,

California

95814

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Pacific Gas

and Electric Company

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

. Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns(Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Pacific

Gas

and Electric Company

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to DMB,(IE01)

DRS,

DRP,

and Decommissioning

bcc distrib.

by RIV:

L. J. Callan

Resident

Inspector

DRSS-FIPB

MIS System

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

To receive copy of document, indicate inboxt "C" ~ Copy without enclo

s "E" ~ Co

with enclosures "N" ~ No copy

RIV:SRI: DRP/E

MDTschiltz

10/~95

C:DRP/E

HJWon'~

10@ 6/95

D:WCFO

KEPerkins

10/

/95

D;DRP

JEDyer

10/

/

5

10/

/95