ML16342D107
| ML16342D107 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/27/1995 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342D108 | List: |
| References | |
| NUDOCS 9511060334 | |
| Download: ML16342D107 (8) | |
See also: IR 05000275/1995014
Text
~j.~EC.X J
(NUDOCS OFFSITE FACILITY)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
!>ACCESSION NBR:9511060334
DOC.DATE: 95/10/27
NOTARIZED:
NO
'OCKET 4
FACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
~
~
~
AUTH.NAME
AUTHOR AFFILIATION
DYER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGERiG.M.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards insp repts
50-275/95-14
6 50-323/95-14
on
950806-0916
a NOV.Violation of concern
because it involves
establishment
of inappropriate
conditions prior to
surveillance testing.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
'NRR/DISP/PIPB
NRR/DRPM/PDLR
NUDOCS-ABSTRACT
OGC/HDS3
EXTERNAL: LITCO BRYCE9J
H
NRC
COPIES
RECIPIENT
LTTR ENCL
ID CODE/NAME
1
1
BLOOM,S
2
AEOD/DEIB
1
1
&EBB CENTER~
1
R/DRCH/HHFB
1
NRR/DRPM/PECB
1
OE DIR
1
RGN4
FILE
01
1
1
NOAC
1
1
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVPSTE! CONTACTTHE DOCUMENTCONTROL
DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMIYATEYOUR Y'AMEFROil
DISTRIBUTIOY:LISTS FOR DOCUMENTS YOU DON'T NEED!
4
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
gy,6 REC0
P0
Cy
A.
0
lA
P r
/4l7 ++*++
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
October
27
1995
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory H. Rueger,
Senior Vice
President
and General
Hanager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT'RC
INSPECTION
REPORT 50-275/95-14;
50-323/95-14
AND NOTICE OF
VIOLATION
This refers to the inspection
conducted
by H. Tschiltz,
and others, of this
office on August
6 through September
16,
1995, at the Diablo Canyon Nuclear
Power Plant, Units
1 and 2, facility.
The purpose of the inspection
was to
determine
whether activities authorized
by the license
were conducted
safely
and in accordance
with NRC requirements.
At the conclusion of the inspecti'on,
the findings were discussed
with those
members of your staff identified in the
enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
the
NRC has determined that two
violations of NRC requirements
occurred.
These violations are cited in the
enclosed
Notice of Violation (Notice)
an'd the circumstances
surrounding
them
are described
in detail in the subject
inspection report.
The first violation
is of concern in that it involves the establishment
of inappropriate
conditions prior to surveillance testing of an emergency diesel
generator.
The second viol.ation is of concern in that initial corrective actions to
resolve
an identified problem in the offsite power supply system
were
inappropriate.
We note that 'previous reviews of the issue
were based
on the
use of judgement rather than calculations
and that there were delays
in
recognizing
and addressing
the offsite power supply system
problem.
Both
violations were brought to your attention
by 'the
NRC.
You are required to respond
to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
yoII should
document the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required
response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
9511060334
951027
ADQCK 05000275
8
Pacific
Gas
and Electric Company
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a c'py of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Hanagement
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Dockets:
50-275
50-323
Licenses:
DPR-82
J.
E. Dyer, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
50-275/95-14;
50-323/95-14
cc w/enclosures:
ATTN:
Dr. Richard
Ferguson
."Energy Chair
1100 11th Street,
Suite
311
Sacramento,
95814
San Luis Obispo
Hothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Pacific Gas
and Electric Company
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
. Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns(Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Pacific
Gas
and Electric Company
Diablo Canyon Nuclear
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to DMB,(IE01)
DRS,
DRP,
and Decommissioning
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
DRSS-FIPB
MIS System
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
M.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy of document, indicate inboxt "C" ~ Copy without enclo
s "E" ~ Co
with enclosures "N" ~ No copy
RIV:SRI: DRP/E
MDTschiltz
10/~95
C:DRP/E
HJWon'~
10@ 6/95
D:WCFO
KEPerkins
10/
/95
D;DRP
JEDyer
10/
/
5
10/
/95