Text
<<I~~Ai4N
F
NOTES:
g~<ggg+Tr v '
~w+lila',,b
.,w~v%tm
+
e ~~PVV~ ~,:eI~J+a
PRIDRIT'Y Z
REGULATORQ~M5515QKMEI$$~1558TION
SYSTEM (RIDS)
ACCESSION NBR:9508020033
DOC.DATE: 95/07/27
NOTARIZED: NO
DOCKET
FACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga '5000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
DYER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGERZG
M
Pacific Gas
& Electric Co.
t
C
SUBJECT:
Forwards
insp repts
50-275/95-11
a 50-323/95-11
on
950514-0624.Non-cited
violations which involved failure to
comply w/maint procedure for maintaining
& monitoring freeze
seal, noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR g ENCLj
SIZE: S
++AGIO
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN4
FILE
01
EXTERNAL: LITCO BRYCE,J
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
MILLERPM
AEOD/DEIB
g)~T
CENTER
NRR/DORS
B
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
U
VOTE TO ALL"RIDS" RECIPIENTS:.
PLEASE HELP I."S TO RED!:CE 'O'ASTE! COXTACTTHEDOCL'iIEir'Oi'TROL
DESK. ROOil PI-37 (EXT, 5(H-D033 ) TO ELIXIliATEYOL'R iAiIEFROil
DISTRIBI."I'IOiLISTS FOR DOCL'i!EATSYOL'Oi "I'
EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
~~8 REGS(
Wp0
I
~*~<<"
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PI.AZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 6064
JUL 27 I995
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
H. Rueger,
Senior Vice
President
and General
Hanager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/95-11;
50-323/95-11
This refers to the inspection
conducted
by H. Tschiltz and
G. Johnston of this
office,
and
H. Hiller of the Office of Nuclear Reactor Regulation,
on Hay
14
through June
24,
1995.
The inspection
included
a review of activities
authorized for your Diablo Canyon Nuclear
Power Plant, Units
1
and 2,
facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
on
page
1, in the enclosed
report.
Three noncited violations are included in this report.
The first violation
involved the failure to comply with a maintenance
procedure for maintaining
and monitoring
a freeze seal.
The second violation was for failing to provide
adequate
emergency lighting for safe
shutdown
areas of the plant.
The third
violation involved
a solid state protection
system design deficiency,
discovered
by your staff, which resulted
in inadequate
electrical
separation
between safety-related
and nonsafety-related
circuits.
The actions that were
taken
by your staff to identify and correct this issue
are considered
to have
been noteworthy.
Although this deficiency
had the potential to be of safety
significance,
the probability of the initiating event which could have
potentially caused
the failure was low.
These violations are not being cited
because
the criteria in Paragraphs
VII.B.1 or
2 of Appendix
C to
of the NRC's "Rules of Practice,"
were satisfied.
We note that there were
several
instances
in this inspection period which demonstrated
weaknesses
in
human performance.
This area warrants further management
attention.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed
in the
NRC Public Document
Room.
950802003~
000~75
50727
"DI C
8
Pacific
Gas
and Electric Company
-2-
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
J.
E. Dyer, Director
Division of Reactor Projects
Dockets:
50-275
50-323
Licenses:
DPR-82
Enclosure:
NRC Inspection
Report
50-275/95-11;
50-323/95-11
cc w/enclosure:
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715 Rocky Canyon
Creston,
93432
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
PRO.
Box 164
Pismo
Beach, California
93448
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
Pacific
Gas
and Electric Company
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
-4-
JUL 27 l995
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
HS:
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:g DC(DC5llrp.HDT
To receive copy of document. indicate in botu
C" ~ Copy without en
ures
"E" ~ Copy with enclosures
N" ~ No copy
RIV:SR I:DRPiE
C:DRP/E
D:WCFO
07/~,/95
07
/95
07/~g/95
HDTschiltz ~
HJWong
y
KEPerkins
Pacific
Gas
and Electric Company
JUL 27 l995
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
.;bcc to
DHB (IEOI)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
HS:
Resident
Inspector
HIS System
Senior Project
Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
M.
Hammond
(PAO,
WCFO)
DOCUHENT NAHE:
R:tt DC~DCSllrp.HDT
Tc receive copy of document, indicate in box: "C" ~ Copy without en
ures
"E" ~ Copy with enclosures "N" a No copy
RI V: SR I:DRPttE
C:DRP/E
MDTschiltz ~
HJWong
y
D:WCFO
KEPerkins
07/ ,/95
07/~r/95
0
07 '95
0
0
Y