Forwards Insp Repts 50-275/95-11 & 50-323/95-11 on 950514-0624.Non-cited Violations Which Involved Failure to Comply W/Maint Procedure for Maintaining & Monitoring Freeze Seal,Noted
ML16342C993
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/27/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C994 List:
References
NUDOCS 9508020033
Download: ML16342C993 (12)


See also: IR 05000275/1995011

Text

<<I~~Ai4N

F

NOTES:

g~<ggg+Tr v '

~w+lila',,b

.,w~v%tm

+

e ~~PVV~ ~,:eI~J+a

PRIDRIT'Y Z

REGULATORQ~M5515QKMEI$$~1558TION

SYSTEM (RIDS)

ACCESSION NBR:9508020033

DOC.DATE: 95/07/27

NOTARIZED: NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga '5000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

DYER,J.E.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERZG

M

Pacific Gas

& Electric Co.

t

C

SUBJECT:

Forwards

insp repts

50-275/95-11

a 50-323/95-11

on

950514-0624.Non-cited

violations which involved failure to

comply w/maint procedure for maintaining

& monitoring freeze

seal, noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCLj

SIZE: S

++AGIO

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

EXTERNAL: LITCO BRYCE,J

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

MILLERPM

AEOD/DEIB

g)~T

CENTER

NRR/DORS

B

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

U

VOTE TO ALL"RIDS" RECIPIENTS:.

PLEASE HELP I."S TO RED!:CE 'O'ASTE! COXTACTTHEDOCL'iIEir'Oi'TROL

DESK. ROOil PI-37 (EXT, 5(H-D033 ) TO ELIXIliATEYOL'R iAiIEFROil

DISTRIBI."I'IOiLISTS FOR DOCL'i!EATSYOL'Oi "I'

EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

~~8 REGS(

Wp0

I

~*~<<"

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PI.AZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 6064

JUL 27 I995

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

H. Rueger,

Senior Vice

President

and General

Hanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-11;

50-323/95-11

This refers to the inspection

conducted

by H. Tschiltz and

G. Johnston of this

office,

and

H. Hiller of the Office of Nuclear Reactor Regulation,

on Hay

14

through June

24,

1995.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Plant, Units

1

and 2,

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

on

page

1, in the enclosed

report.

Three noncited violations are included in this report.

The first violation

involved the failure to comply with a maintenance

procedure for maintaining

and monitoring

a freeze seal.

The second violation was for failing to provide

adequate

emergency lighting for safe

shutdown

areas of the plant.

The third

violation involved

a solid state protection

system design deficiency,

discovered

by your staff, which resulted

in inadequate

electrical

separation

between safety-related

and nonsafety-related

circuits.

The actions that were

taken

by your staff to identify and correct this issue

are considered

to have

been noteworthy.

Although this deficiency

had the potential to be of safety

significance,

the probability of the initiating event which could have

potentially caused

the failure was low.

These violations are not being cited

because

the criteria in Paragraphs

VII.B.1 or

2 of Appendix

C to

10 CFR Part 2

of the NRC's "Rules of Practice,"

were satisfied.

We note that there were

several

instances

in this inspection period which demonstrated

weaknesses

in

human performance.

This area warrants further management

attention.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed

in the

NRC Public Document

Room.

950802003~

000~75

50727

PDR

"DI C

PDR

8

Pacific

Gas

and Electric Company

-2-

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

J.

E. Dyer, Director

Division of Reactor Projects

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

NRC Inspection

Report

50-275/95-11;

50-323/95-11

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

PRO.

Box 164

Pismo

Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

Pacific

Gas

and Electric Company

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

-4-

JUL 27 l995

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

HS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:g DC(DC5llrp.HDT

To receive copy of document. indicate in botu

C" ~ Copy without en

ures

"E" ~ Copy with enclosures

N" ~ No copy

RIV:SR I:DRPiE

C:DRP/E

D:WCFO

07/~,/95

07

/95

07/~g/95

HDTschiltz ~

HJWong

y

KEPerkins

Pacific

Gas

and Electric Company

JUL 27 l995

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

.;bcc to

DHB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

HS:

Resident

Inspector

HIS System

Senior Project

Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

M.

Hammond

(PAO,

WCFO)

DOCUHENT NAHE:

R:tt DC~DCSllrp.HDT

Tc receive copy of document, indicate in box: "C" ~ Copy without en

ures

"E" ~ Copy with enclosures "N" a No copy

RI V: SR I:DRPttE

C:DRP/E

MDTschiltz ~

HJWong

y

D:WCFO

KEPerkins

07/ ,/95

07/~r/95

0

07 '95

0

0

Y