Forwards Insp Plans for Plant in Preparation for Insp & Incorporation of 24 Month SALP Period Ending on 960831.Insps Primarily Mandatory Core & Safety Initiative Insp W/Few Regional Insps
ML16342C929
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/08/1995
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9505180231
Download: ML16342C929 (14)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 gAY -8 l995 Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN:

Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Street, Room 1451 P.O.

Box 770000 San Francisco, California 94177

SUBJECT:

NRC INSPECTION PLANS FOR DIABLO CANYON, UNITS 1

AND 2 As outlined in a letter dated February 10,

1995, from James M. Taylor (NRC) to Richard A. Clark (PG&E), the NRC has recognized Diablo Canyon Nuclear Power Plant (DCPP) as a superior performer.

This recognition resulted in Region IV conducting a review to reduce planned.inspection resources and the incorporation of a 24-month SALP period.

The planned inspections at DCPP for the remainder of the SALP period, now ending on August 31,

1996, are primarily.

the mandatory core and safety initiative inspections with only a few regional initiative inspections planned as discussed below.

In addition, the resident staff will be maintained at a senior resident inspector and one resident inspector, rather than the two resident inspectors that are utilized at other two-unit sites.

Regional initiative inspections are planned in the following areas:

minimum hours for closure of previous inspection findings and licensee event reports; 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> for a steam generator tube integrity review, including 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> for a review of use of emergency operating procedures in response to tube leaks; 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for inservice inspection on Unit 1; 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> for a review of 10 CFR 50.59 safety evaluations by the NRR Project Manager; and 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> for an emergency planning exercise walkthrough inspection.

There are also 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of inspection time set aside for review of Occupational Safety and Health Administration (OSHA) requirements by agreement through a memorandum of understanding between the NRC and OSHA.

A regional initiative inspection effort of 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> has also been set aside to account for close out of Generic Letter 89-10 for motor-operated valve testing and surveillance which was previously accounted for under Temporary Instruction 2515/109.

Inspections currently scheduled to be performed in calendar year 1995 include core inspections of resident inspector

areas, engineering, and emergency planning; and initiative inspections for the review of 10 CFR 50.59 safety evaluations; review of steam generator tube integrity and use of emergency operating procedures in response to tube leaks; emergency planning exercise wa'ikthrough; and closure of previous inspection findings and licensee event reports as appropriate.

PDR qDOC<

9SOS08 9505$ 8Ppag 8

< 0SQOOayg Poa Zgo(

0

Pacific Gas and Electric Company A copy of the NRC mandatory core inspection program (MC 2515) is enclosed for your information.

You should be advised that all the hours listed for each inspection activity (including those listed in this-letter) are nominal and can vary substantially based upon inspection circumstances.

A review of planned inspection hours is done quarterly in Region IV.

Planned inspection hours may be modified based on performance over that period or may be modified at any time in reaction to an event or problem at a facility.

You will be notified of any changes to inspection plans at DCPP during the remainder of the SALP period.

Please contact Jim Dyer (817/860-8180) if you have any questions on inspection plans at DCPP."

Sincerely,

Enclosure:

MC 2515 L.

. Callan Reg nal Administrator Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 CC:

Sierra Club California ATTN:

Dr. Richard Ferguson Energy Chair 6715 Rocky Canyon Creston, California 93432 San Luis Obispo Mothers for Peace ATTN:

Ms. Nancy Culver P.O.

Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448

Pacific Gas and Electric Company The County Telegram Tribune ATTN:

Managing Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors ATTN:

Chairman Room 370 County Government 'Center San Luis Obispo, California 93408 California Public Utilities Commission ATTN:

Mr. Truman Burns(Mr. Robert Kinosian 505 Van Ness, Rm.

4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee Attn:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN:

Mr. Steve Hsu P.O.

Box 942732 Sacramento, California 94234 State of California ATTN:

Mr. Peter H. Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101 Pacific Gas and Electric Company ATTN:

Christopher J.

Warner, Esq.

P.O.

Box 7442 San Francisco, California 94120 Diablo Canyon Nuclear Power Plant ATTN:

Warren H. Fujimoto, Vice President and Plant Manager P.O.

Box 56 Avila Beach, California 93424

Pacific Gas and Electric Company MAY -8 1995 bcc to DMB (IEOI) bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

RIV File Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System Sr. Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO) g~ q@HAH PgdHO~

o1~"

5 To receive copy of document, indic e in box: "C" ~ Copy w'ut enclosures "E" ~ Copy with enclosures "N" ~ No copy RIV:PI C:DR /

DWF D:

P D:DRS GWJohnston; DDCha lain KEP ns AB e TPGwynn 4/

/95 0:

SS S

1 1 in 4

/

4/

/9 NRR dred EGAdensam 5/8 /95

/

95 4/5>/95 JMMon ery L

an

/

/95 4/

/95 OFFICIAL RECORD COPY 4/

/95

Pacific Gas and Electric Company MAY -8 I995

~togGHB~;(:IEOi} J bcc distrib

~ by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

RIV File Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System Sr. Project Inspector (DRP/E, WCFG)

Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

To receive copy of document, ind'~

q@crSCOR p~~~rt~

A~"

einbox:

C" e Copyw'utenclosures E" ~ Copywith enclosures N-e Nocopy RIV:PI GWJohnston; 4/

/95 0:

SS C:DR /

DDCha lain 4/

/9 NRR Se 0:W F

KEP ns

/

95 D:

P 0:DRS TPGwynn AB e 4/g)/95 4/

/95 S

llin 4

/

EGAdensam S/8 /95 4/

/95 OFFICIAL RECORD COPY /

/95 JMMon cry L

an

MC 2515 APPENDIX A CORE INSPECTION PROGRAM PROCEDURES IP No.

Functional Area:

Ins ection Proc. Title Est.

Hours to Com lete IP

, 1-Unit 2-Unit 3-Unit

~Fre ueec Site 71707 40500 71001 61726 62703 73753 37550 37551 Plant 0 erations:

Plant Operations Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems Licensed Operator Requalifi-cation Program Evaluation Maintenance:

Surveillance Observations Haintenance Observations Inservice Inspection

~E Engineering Onsite Engineering H

60 SC 192 SC 96 BH 20 H

15 SC 32 SC 180 BH 13 84 192 96 20 15 32 252 19 108 192 96 20 15 32 324 24

- Annual 8 - Biennial BH - Bimonthly H - Monthly SC SALP Cycle EO Every Other SALP Cycle See also 2515-04.

For multi-unit sites, rotate the inspection effort among units, i.e., norma11y one unit each stated frequency.

The rotation may be varied to allow observation of scheduled or unscheduled safety significant activities.

Normally performed during a refueling or major outage.

If no such outage occurs during the SALP cycle, the Regional Administrator may waive the requirement to perform this inspection procedure.

Issue Date:

04/15/94 A-1 2515 Appendix A

P No.

Functional Area:

n t'on Pro Title st.

Hours t Com lete IP 1-Unit 2-Unit 3-Unit

~equei~c gite Site Site 64704 I

71750 81700 82301 82302 82701 83750 84750 Fire Protection Program Plant Support Activities Physical Security Program for Power Reactors Evaluation of Exercises for Power Reactors Review of Exercise Objectives and Scenarios for Power Reactors Operational Status of the Emergency Preparedness Program Occupational Radiation Exposure Radioactive Waste Treatment, and Effluent and Environmental Honitoring EO 25 SC 135 SC 60 90 12 SC 35 SC 75 SC 75 25 171 90 12 35 105 105 25 189 108 90 12 35 135 135 86750 Solid ".ad.

Waste Hanagement Trar. portation of Radioactive Materials SC 20 28 36 END 2515 Appendix A A-2 Issue Date:

04/15/94