ML16342C848

From kanterella
Jump to navigation Jump to search
Discusses NRC Review of Which Transmitted Rev 3, Change 14,to Plant Ep.Informs That Rev Submitted Per 10CFR50.54(q),incorporated Listed Changes & Acceptable
ML16342C848
Person / Time
Site: Diablo Canyon  
Issue date: 02/28/1995
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9503070069
Download: ML16342C848 (10)


Text

pe Racy o

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON,TEXAS 76011 FEB 2S 95

'I, Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN:

Gregory H. Rueger, Senior Vice President and General Manager Nuclear Power Generati'on Bus. Unit 77 Beale Street, Room 1451 P.O.

Box 770000 San Francisco, California 94177

SUBJECT:

CHANGES TO THE DIABLO CANYON UNITS 1

AND 2, EMERGENCY PLAN, REVISION 3, CHANGE 14 We have received your letter dated January 25, 1995, which transmitted Revision 3, Change 14, to the Diablo Canyon Nuclear Power Plant Emergency Plan.

This revision was submitted pursuant to 10 CFR 50.54(q) and incorporated the following changes:

(1) implementation of 10 CFR Part 20 requirements, (2) implementation of EPA 400-R-92-001

guidance, (3) update emergency action levels in the plan to be consistent with those in Revision 21 to Emergency Plan Implementing Procedure EPIP G-l, (4) rewrite of Section 9

dealing with recovery, and (5) miscellaneous administrative/editorial changes.

This also refers to telephonic discussions of the changes between A. Hcgueen of Region IV and H.

Hug and others of the Diablo Canyon Nuclear Power Plant staff and T.

Owyang of the Pacific Gas and Electric Company Corporate staff on February 16 and 17, 1995.

I We have reviewed Revision 3, Change 14.

The rewritten Section 9 to the plan did not address certain criteria of Planning Standard H, "Recovery and Reentry Planning and Postaccident Operations," of NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency

Response

Plans and Preparedness in Support of Nuclear Power Plants."

These criteria had been addressed or referred to in previous plan versions.

In discussions with your staff, it was agreed that the next emergency plan change will include a

revision of Section 9 to address or reference locations of your implementation of planning criteria contained in Planning Standard M, NUREG-0654.

Otherwise, our review determined that the changes are acceptable and do not appear to degrade the effectiveness of your emergency planning at the Diablo Canyon Nuclear Power Plant.

Should you have any questions concerning this letter, please contact Nr.

Arthur D. Mcgueen at (510) 975-0241.

Sincerely, e

o

ins,

>rector Division of Radiation Safety and Safeguards 9503070069 950228 PDR ADQCK 05000275 F

PDR

Pacific Gas and Electric Company Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 CC:

Sierra Club California ATTN:

Dr. Richard Ferguson Energy Chair 6715 Rocky Canyon

Creston, California 93432 San Luis Obispo Mothers for Peace ATTN:

Ms. Nancy Culver P.O.

Box 164

Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448 The County Telegram Tribune ATTN:

Managing Editor 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors ATTN:

Chairman Room 370 County Government Center San Luis Obispo, California 93408 California Public Utilities Commission ATTN:

Mr. Truman Burns)Mr. Robert Kinosian 505 Van Ness, Rm.

4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee Attn:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN:

Mr. Steve Hsu P.O.

Box 942732 Sacramento, California 94234

Pacific Gas and Electric Company State of California ATTN:

Hr. Peter H. Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101 Pacific Gas and Electric Company ATTN:

Christopher J.

Warner, Esq.

P.O.

Box 7442 San Francisco, California 94120 Diablo Canyon Nuclear Power Plant ATTN:

Warren H. Fujimoto, Vice President and Plant Manager P.O.

Box 56, Avila Beach, California 93424 Chief, Technological Hazards Branch FEMA Region IX ATTN:

Joe Dominguez Building 105 Presidio of San Francisco San Francisco, California 94129

Pacific Gas and Electric Company bcc:

DMB (A045)

L. J. Callan Diablo Canyon Resident Inspector DRSS-F IPB MIS System Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

RIV File Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

B. Henderson (PAO, WCFO)

DRSS-RIB Action Item File (Hodges)

C. A. Hackney, SLO A. D. Mcgueen, WCFO (RIB/DRSS)

RITS Coordinator E.

F. Bates, IRC S.

Peterson, NRR Project Manager (MS 13 E19)

T. Essig, NRR/DOTS/TERB (MS 9 H15)

DOCUMENT NAME G iHODGESiDOCUMENTiE-95-05.ADM AI E-95-05 TAG¹ X03267 To receive copy of doc e t, indicate in box: " "

Copy without enclosure "E"

py ith enclosures "N" ~ No copy RIV:RIB ADMcO een:nh 02 95 C: RIB BMurray 02

/95 DD:DRSS RAScar o

0

/95 D

D SJCol1 ins 02/

/95 02/

/95

Pacific Gas and Electric Company bcc:

DHB Q!045)

L. J. Callan Diablo Canyon Resident Inspector DRSS-FIPB MIS System Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

RIV File Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

B. Henderson (PAO, WCFO)

DRSS-RIB Action Item File (Hodges)

C. A. Hackney, SLO A. D. Mcgueen, WCFO (RIB/DRSS)

RITS Coordinator E.

F. Bates, IRC S,

Peterson, NRR Project Manager (MS 13 E19)

T. Essig, NRR/DOTS/TERB (MS 9 H15)

DOCUMENT NAME:

G:ItHODGESItDOCUMENTitE-95-05.ADM To receive copy of doc e t, indicate in box: " " ~ Copy without enclosure "E"

AI E-95-05 TAC¹ X03267 py ith enclosures "N" ~ No copy RIV:RIB ADMcO een:nh 02 95 C:RIB BMurray 02

/95 DD:DRSS RAScar o

0

/95 D:D SJCollins 02/

/95 02/

/95

~.