Informs That Administration of Licensing Exams,To Be Ref in Insp Repts 50-275/95-04 & 50-323/95-04,scheduled for Wk of 950522 at Plant Per 950125 Telcon.Ref Matls to Be Submitted by 950222
ML16342C829
Person / Time
Site: Diablo Canyon  
Issue date: 02/07/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9502150079
Download: ML16342C829 (12)


See also: IR 05000275/1995004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

FEB T l995

Pacific Gas

and Electric Company

Nuclear Power Generation,

B14A

ATTN:

Gregory H. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

California

94177,

SUBJECT:

NRC INSPECTION

REPORT 50-275/95-04;

50-323/95-04

In a telephone

conversation

on January

25,

1995 between

Messrs J.

Welsch

and J. Pellet,

arrangements

were

made for the administration of licensing

examinations

at the Diablo Canyon Nuclear

Power Plant.

The examinations

are scheduled for the week of May 22,

1995.

Your staff will

be given

an opportunity to review the licensing examinations

in accordance

with the guidelines in Revision

7 of NUREG-1021,

"Operator Licensing Examiner

Standards,"

(ES-201,

Attachment

4) during the week of May 8,

1995.

To prepare

the examinations

and meet the above schedule, it will be necessary

for your staff to furnish the reference materials identified in Attachment

2

of ES 201 by February

22,

1995.

Any delay in receiving approved

and indexed

reference

material or the submittal of inadequate

or incomplete reference

material

may result in the examinations

being rescheduled.

The

NRC will prepare

and administer the written examinations

in accordance

with ES-401

and

ES-402 of NUREG-1021.

In order to conduct the requested

examinations, it will be necessary

for your staff to provide adequate

space

and accommodations

on the date noted above.

The NRC's guidelines for

administering the written examinations

are described

in ES-402,

Attachment

1.

The

NRC will prepare

and administer the operating tests

in accordance

with

ES-301

and

ES-302 of NUREG-1021.

In order to conduct the requested

operating

tests, it will be necessary

for your staff to make the simulation facility

available

on the dates

noted above.

Your staff should retain the original

simulator performance

data (e.g.,

system pressures,

temperatures,

and levels)

generated

during the dynamic operating tests until the examination results

are

final.

Attachment

2 of ES-402

and Attachment

1 of ES-302 contain

a number of

NRC policies

and guidelines that will be in effect while the written

examination

and operating tests

are being administered.

95O2qq0079

SS02

PDR

ADOCK 0

8

Pacific Gas

and Electric Company

Your staff should submit preliminary reactor operator

and senior reactor

operator license applications

and waiver requests

at least

30 days before the

first examination

date

so that the

NRC will be able to review the applications

and the medical certifications

and evaluate

any requested

waivers.

If the

applications

are not received at least

30 days before the examination date,

a

postponement

may be necessary.

Final, signed applications certifying that all

training has

been

completed

should

be submitted at least

14 days before the

first examination date.

i

This request is covered

by Office of Management

and Budget

(OHB) Clearance

Number 3150-0101,

which expires October 31,

1995.

The estimated

average

burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,

including gathering,

photocopying,

and

mailing the required material.

Send

comments

regarding this burden estimate

or any other aspect of this collection of information, including suggestions

for reducing this burden,

to the Information and Records

Management

Branch,

T-6 F33, Division of Information Support Services,

Office of Information

Resources

Management,

U.S. Nuclear Regulatory Commission,

Washington,

D.C.

20555;

and to the Paperwork Reduction Project

(3150-0101), Office of

Information and Regulatory Affairs, NEOB-10202, Office of Hanagement

and

Budget, llashington,

D.C. 20503.

Thank you for your cooperation

in this matter.

Hr. Welsch

has

been

advised of

the policies

and guidelines referenced

in this letter.

If you have

any

questions

regarding the NRC's examination

procedures

and guidelines,

please

contact Mr. S. H'Crory at (817)860-8265 or Hr. J. Pellet at (817)860-8159.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

omas

P.

Gw nn, Director

Division of

actor Safety,

RIV

CC:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

4

0

Pacific Gas

and Electric Company

-3-

San Luis Obispo

Hothers for Peace

ATTN:

Hs. Nancy Culver

P.O.

Box 164

Pismo Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach, California

93448

The County Telegram Tribune

ATTN:

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns)Hr. Robert Kinosian

505 Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Honterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Hr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Hr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Electric Company

Pacific Gas

and Electric Company

ATTN:

Christopher J. Qarner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Mar ren H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific Gas

5 Electric Co.

ATTN:

Jim Melsch

Operations Training Supervisor

P. 0.

Box 56

Avila Beach,

CA

93424

Pacific Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE42),

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB, HS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9EIO)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:(DC504LT.SLH

To reoolve copy of document, indicate In bcx: "C"

Co

without enctosures

"E" i Copy with en

sures

N

No copy

RIV:RE:OB

SLHcCror

C:QB

N

ADD:

JLPellet

ATHo e

D:D

ABBeac

D:DRSi

TPGw

02/

/95

02/ / 5

02

/95

OF ICIAL RECORD

COPY

02/& 95

02/

/95

02/

/95

Pacific Gas

and Electric Company

I

II

E-Mail report to D. Sullivan

(DJS)

bcc to

DMB (IE42)

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

MCFO)

RIV File

Leah Tremper

(OC/LFDCB, MS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

MCFO)

Branch Chief (DRP/TSS)

TMFN 9E10)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:ItDC504LT.SLM

Tc recelw copy of document, Indtcste inbcx: "C" ~ Co

without endo ures

"E" a Copy with enc

sures

N" ~ No copy

RIV:RE:OB

C:OB

N

ADD:

SLMcCror

JLPellet

ATHo e

D:D

ABBeac

D:DRS>

TPGw

02/

/95

02/& /95

02/

/95

02/ /

5

OF ICIAL RECORD

COPY

02

/95

02/

/95