Text
PRIDRIT'Y Z
REGULATORY(~MNNTIMMAECf5%'MSUTIONSYSTEM (RIDS)
ACCESSION NBR:9501030050
DOC.DATE: 94/12/27
NOTARIZED: NO
DOCKET
CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga '5000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
UTH.NAME
AUTHOR AFFILIATION
COLLINS,S.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGERFG.M.
Pacific Gas
6 Electric Co.
SUBJECT:
Forwards
insp repts
50-275/94-26
a 50-323/94-26
on
941024-28.Violations
noted but not cited.
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Environ
a Radiological
(50 DKT)-Insp Rept/Notice of Violation R
NOTES:
ons
C
'E
ID CODE/NAME
PD4-2
INTERNAL: ACRS
~FILE
ENTER
OOi
NRR/DREP/PRPB10
NRR/PMAS/IRCB-E
OE DIR
RGN4
FILE
01
RNAL: NOAC
COPIES
LTTR ENCL
1
1
2
2
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PETERSONFS
AEOD/TTC
NMSS/SGTB
4E4
NRR/PMAS/ILRB12
NUDOCS-ABSTRACT
OGC/HDS3
RGN4
DRSS/RPB
RGN4/FIPS
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Y
D
0
C,
U
E
YOTE TO ALL RIDS" RECIPIENTS:.
PLEASE HELP US TO REDUCE WASTE! COiNTACTTHE DOCL'ME4TCOYTROL
DESK, ROOM P 1-37 (EXT. 504-2083
) TO ELIMIYATE YOUR YAMEFROiI
DISTRIBI.'.TIOY'ISTS FOR DOCUKIEYTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
.
~I 8 REGu
Wp
C
0
UN IT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA ORIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
Decmeber
27,
1994
EA 94-255
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Hanager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/94-26;
50-323/94-26
This refers to the inspection
conducted
by Hr.
W. L. Holley of this office on
October 24-28,
1994.
The inspection
included
a review of activities
authorized for your Diablo Canyon Nuclear
Power Plant,
Units
1 and 2,
facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report,
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
in the
enclosed report.
It was identified by your staff that,
on two occasions,
individuals willfully
entered
areas controlled
(HRAs) without complying with
applicable requirements.
This was in violation of Technical
Specification 6. 12. 1.
Although these
examples
were willful, this violation is
not being cited because
the criteria in paragraph
VII.B.2 of Appendix
C to
10 CFR Part 2 of the
NRC's "Rules of Practice,"
were satisfied.
We recognize that these violations were identified by
PGEE personnel
and that
each resulted
in disciplinary action against
the individuals who elected to
violate requirements.
The
NRC views this as'a positive indicator of the
strength of PGEE's
programs.
Nonetheless,
because
violations of HRA
requirements
have
been
a recurring problem at Diablo Canyon,
the
NRC believes
that
a meeting to discuss this concern
would be beneficial.
It is our understanding,
based
on
a conversation
between
Hs. Ka'thleen
Hubbard
of your staff and Blaine Hurray of Region
IV on December
13,
1994, that
a
meeting will be conducted
on January
4,
1995,
at your facility to discuss
whether additional corrective actions
concerning this type of violation are
warranted.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
9501030050 94i227
ADQCK 05000275
8
Pacific
Gas
and Electric Company
-2-
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Dockets:
50-275
50-323
Licenses:
DPR-82
Samuel
J. Collins, Director
Division of Radiation Safety
and Safeguards
Enclosure:
Appendix -
NRC Inspection
Report
50-275/94-26;
50-323/94-26
cc w/enclosure:
Sierra
Club California
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715 Rocky Canyon
Creston,
93432
San Luis Obispo
Hothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Hs. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Hanaging Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
~
~
Pacific
Gas
and Electric Company
-3-
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
RE Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN;
Mr, Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr, Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific Gas
and Elect ic Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
John
Townsend,
Vice President
and Plant
Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
E-Mail report to
DE Sullivan
(DJS)
bcc to
DHB ( IE06)
bcc distrib.
by RIV:
L. J.
Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
MS:
B. Henderson
(PAO,
WCFO)
G.
F. Sanborn,
W. L. Holley,
FIPB/DRSS
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
J.
Lieberman,
(MS
7 H5)
B. Hurray,
FIPB/DRSS
DOCUMENT NAME:
G:~tHODGESiDOCUMENTiDC426RP.WLH
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures
"N
~ No c
y
RIV:FIPB
- WLHolley:nh
12/
/94
D:DRSS
SJCollin
12/
/94
C: FIPB
- BMurray
12/
/94
D:OE
JLie
man
12/
/94
- GFSanborn
12/
/94
DD:DRSS
- RAScarano
12/
/94
D:DRP
ABBeach
12/
/94
- Previous y concurred.
QQUQ&3
I
Pacific Gas
and Electric Company
E-Hail report to D. Sullivan
(DJS)
, bcc to
DMB (IE06)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
MS:
B. Henderson
(PAO,
WCFO)
G.
F. Sanborn,
W. L. Holley,
FIPB/DRSS
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
J.
Lieberman,
(HS
7 H5)
B. Hurray,
FIPB/DRSS
C: FIPB
RIV:FIPB
DD:DRSS
D:DRP
ABBeach
- GFSanborn
- WLHolley:nh
- RAScarano
- BMurray
DOCUMENT NAME:
G:iHODGESttDOCUHENTtt,DC426RP.WLH
To receive copy of document, indicate in box: "C" ~ Copywithout enclosures
"E" ~ Copy with enclosures "N" ~ No
y
g
12/
/94
12/
/94
0:DRSS
SJCollin
12/
/94
D:OE
JLie
man
12/
/94
- Previous y concurre
.
12/
/94
12/
/94
12/
/94
0