Forwards Insp Repts 50-275/94-26 & 50-323/94-26 on 941024-28.Violations Noted But Not Cited
ML16342C785
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/27/1994
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C786 List:
References
NUDOCS 9501030050
Download: ML16342C785 (12)


See also: IR 05000275/1994026

Text

PRIDRIT'Y Z

REGULATORY(~MNNTIMMAECf5%'MSUTIONSYSTEM (RIDS)

ACCESSION NBR:9501030050

DOC.DATE: 94/12/27

NOTARIZED: NO

DOCKET

CIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga '5000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

UTH.NAME

AUTHOR AFFILIATION

COLLINS,S.J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERFG.M.

Pacific Gas

6 Electric Co.

SUBJECT:

Forwards

insp repts

50-275/94-26

a 50-323/94-26

on

941024-28.Violations

noted but not cited.

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Environ

a Radiological

(50 DKT)-Insp Rept/Notice of Violation R

NOTES:

ons

C

'E

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

~FILE

ENTER

OOi

NRR/DREP/PRPB10

NRR/PMAS/IRCB-E

OE DIR

RES

RGN4

FILE

01

RNAL: NOAC

COPIES

LTTR ENCL

1

1

2

2

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PETERSONFS

AEOD/TTC

NMSS/SGTB

4E4

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

OGC/HDS3

RGN4

DRSS/RPB

RGN4/FIPS

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Y

D

0

C,

U

E

YOTE TO ALL RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE WASTE! COiNTACTTHE DOCL'ME4TCOYTROL

DESK, ROOM P 1-37 (EXT. 504-2083

) TO ELIMIYATE YOUR YAMEFROiI

DISTRIBI.'.TIOY'ISTS FOR DOCUKIEYTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

.

~I 8 REGu

Wp

C

0

UN IT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

Decmeber

27,

1994

EA 94-255

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Hanager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-26;

50-323/94-26

This refers to the inspection

conducted

by Hr.

W. L. Holley of this office on

October 24-28,

1994.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Plant,

Units

1 and 2,

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report,

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed report.

It was identified by your staff that,

on two occasions,

individuals willfully

entered

areas controlled

as high radiation areas

(HRAs) without complying with

applicable requirements.

This was in violation of Technical

Specification 6. 12. 1.

Although these

examples

were willful, this violation is

not being cited because

the criteria in paragraph

VII.B.2 of Appendix

C to

10 CFR Part 2 of the

NRC's "Rules of Practice,"

were satisfied.

We recognize that these violations were identified by

PGEE personnel

and that

each resulted

in disciplinary action against

the individuals who elected to

violate requirements.

The

NRC views this as'a positive indicator of the

strength of PGEE's

programs.

Nonetheless,

because

violations of HRA

requirements

have

been

a recurring problem at Diablo Canyon,

the

NRC believes

that

a meeting to discuss this concern

would be beneficial.

It is our understanding,

based

on

a conversation

between

Hs. Ka'thleen

Hubbard

of your staff and Blaine Hurray of Region

IV on December

13,

1994, that

a

meeting will be conducted

on January

4,

1995,

at your facility to discuss

whether additional corrective actions

concerning this type of violation are

warranted.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

9501030050 94i227

PDR

ADQCK 05000275

8

PDR

Pacific

Gas

and Electric Company

-2-

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Samuel

J. Collins, Director

Division of Radiation Safety

and Safeguards

Enclosure:

Appendix -

NRC Inspection

Report

50-275/94-26;

50-323/94-26

cc w/enclosure:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

~

~

Pacific

Gas

and Electric Company

-3-

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

RE Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN;

Mr, Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr, Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Elect ic Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant

Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail report to

DE Sullivan

(DJS)

bcc to

DHB ( IE06)

bcc distrib.

by RIV:

L. J.

Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

MS:

B. Henderson

(PAO,

WCFO)

G.

F. Sanborn,

EO

W. L. Holley,

FIPB/DRSS

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

J.

Lieberman,

OE

(MS

7 H5)

B. Hurray,

FIPB/DRSS

DOCUMENT NAME:

G:~tHODGESiDOCUMENTiDC426RP.WLH

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures

"N

~ No c

y

RIV:FIPB

  • WLHolley:nh

12/

/94

D:DRSS

SJCollin

12/

/94

C: FIPB

  • BMurray

12/

/94

D:OE

JLie

man

12/

/94

EO

  • GFSanborn

12/

/94

DD:DRSS

  • RAScarano

12/

/94

D:DRP

ABBeach

12/

/94

  • Previous y concurred.

QQUQ&3

I

Pacific Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

, bcc to

DMB (IE06)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

MS:

B. Henderson

(PAO,

WCFO)

G.

F. Sanborn,

EO

W. L. Holley,

FIPB/DRSS

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

J.

Lieberman,

OE

(HS

7 H5)

B. Hurray,

FIPB/DRSS

C: FIPB

RIV:FIPB

EO

DD:DRSS

D:DRP

ABBeach

  • GFSanborn
  • WLHolley:nh
  • RAScarano
  • BMurray

DOCUMENT NAME:

G:iHODGESttDOCUHENTtt,DC426RP.WLH

To receive copy of document, indicate in box: "C" ~ Copywithout enclosures

"E" ~ Copy with enclosures "N" ~ No

y

g

12/

/94

12/

/94

0:DRSS

SJCollin

12/

/94

D:OE

JLie

man

12/

/94

  • Previous y concurre

.

12/

/94

12/

/94

12/

/94

0