Text
j. Ml~MLI
X
REGULATORN $85tkRFIN IBRRF86TION SYSTEM
( RIDS )
CESSION NBR:9412230072
DOC.DATE: 94/12/16
NOTARIZED: NO
DOCKET I
CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
BEACHFA.B.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT: Forwards
insp repts
50-275/94-29
& 50-323/94-29
on 941101-
1201
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation
esponse
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
AEOD/DT.C
%FEED
CENTER
02
NRR/DRCH HHFB
NUDOCS-ABSTRACT
OGC/HDS3
ERNAL: LITCO BRYCEFJ
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PETERSONFS
AEOD/DEIB
AEOD/SPD/RRAB
DEDRO
NRR/DORS/OEAB
NRR/PMAS/IRCB-E
OE DIR
RGN4
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
VOTE TO ALL"RIDS" RECIPIENT'TS:
PLEASE HELP US TO REDI.'CE iVASTE!COY'TACTTHE DOCL'XIEYTCOi'TROL
DESk. ROOil P I.37 ( EXT. 504-
OS3 ITO F LIifIMTE 5'OL'R iAiIF.F ROTI
DIS'I'RlBL"I'IOi I.IS'I'S I'OR
DOCI.'ALIEN'I'S
VOL'Oi "I'
L'ED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
vcv
I O iid4
Dockets:
50-275
50-323
Licenses:
DPR-82
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/94-29;
50-323/94-29
AND NOTICE OF
VIOLATION
This refers to the special
inspection
conducted
by G.
W. Johnston of this
office on November
1 through
December
2,
1994, of the circumstances
associated
with MODE
1 operation of Diablo Canyon,
Unit 2, with three of four safety
injection accumulators
at less
than the minimum pressure
required
by plant
Technical Specifications.
The inspection
included
a review of activities
authorized for your Diablo Canyon Nuclear
Power Plant, Units
1 and 2,
facility.
At the conclusion of the inspection,
the findings were discussed
with members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation
of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified
in the enclosed
Notice of
Violation (Notice).
The first violation involved improper entry into
operating
MODEs
1,
2,
and
3 (above
1000 psig) with accumulators
2-2, 2-3,
and
2-4 below the Technical Specification
minimum pressure.
The second violation
involved two examples
where your staff failed to follow procedures
for
establishing
and verifying the boundaries
for a clearance
for your main
system
upgrades.
The third violation involved two examples of
inadequate
procedures
for ensuring timely evaluation of out-of-tolerance
conditions prior to plant restart
and appropriate initial test conditions for
performing accumulator
pressure
instrument
channel calibrations.
9412230072
941216
ADOCK 05000275
Q
~EOI
/<
0
Pacific
Gas
and Electric Company
These violations are of concern
because
they involve
a failure of three
controls for equipment configuration
management
which resulted
in the restart
of Unit 2 with three accumulators
below the, Technical Specification
minimum
pressure.
These control failures are improper implementation of equipment
clearances,
inadequate
procedures
for surveillance testing,
and
a lack of
prompt corrective actions for nonconforming conditions,
Had any of these
three controls
been effective,
the
mode changes
with inoperable
could have
been prevented.
You are required to respond to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Sincerely,
A. Bill Beach,
Director
Division of Reactor Projects
Enclosure:
1.
Appendix
2.
Appendix
8
NRC Inspection
Report
50-275/94-29;
50-323/94-29
cc w/enclosure:
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715
Rocky Canyon
Creston,
93432
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
0
Pacific
Gas
and Electric Company
Ns. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Hanaging Editor
1321
Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Hr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington, Esq.,
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Nr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Hr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
John
Townsend,
Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
0
1
Pacific
Gas
and Electric Company
OEC
I 6 tggg
E-Hail report to D. Sullivan
(DJS)
bcc to
DMB ( IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB, HS:
A. B. Beach,
(D/DRP)
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RIV:DRP/E*
C:DRP/E*
GWJohnston
DFKirsch
12/2/94
12/2/94
"previous y concurre
D:WCFO~
KEPerkins'f8~
12//&/94
D:DRP
Beach ~
12//&/94
- l
Pacific
Gas
and Electric Company
OEC
I 6 l994
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
MS:
A. B. Beach,
(D/DRP)
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RIV:DRP/E*
C:DRP/E*
D:WCFO~
D:DRP
DFKirsch
12/2/94
GWJohnston
12/2/94
previous
'
concurre
12/gr/94
12//& /94
KEPerkinsfB~
Beach ~
ei
0