Forwards Insp Repts 50-275/94-29 & 50-323/94-29 on 941101- 1201 & Notice of Violation
ML16342C771
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/16/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C772 List:
References
NUDOCS 9412230072
Download: ML16342C771 (12)


See also: IR 05000275/1994029

Text

j. Ml~MLI

X

REGULATORN $85tkRFIN IBRRF86TION SYSTEM

( RIDS )

CESSION NBR:9412230072

DOC.DATE: 94/12/16

NOTARIZED: NO

DOCKET I

CIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

BEACHFA.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT: Forwards

insp repts

50-275/94-29

& 50-323/94-29

on 941101-

1201

& notice of violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation

esponse

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

AEOD/DT.C

%FEED

CENTER

02

NRR/DRCH HHFB

NUDOCS-ABSTRACT

OGC/HDS3

ERNAL: LITCO BRYCEFJ

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PETERSONFS

AEOD/DEIB

AEOD/SPD/RRAB

DEDRO

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

VOTE TO ALL"RIDS" RECIPIENT'TS:

PLEASE HELP US TO REDI.'CE iVASTE!COY'TACTTHE DOCL'XIEYTCOi'TROL

DESk. ROOil P I.37 ( EXT. 504-

OS3 ITO F LIifIMTE 5'OL'R iAiIF.F ROTI

DIS'I'RlBL"I'IOi I.IS'I'S I'OR

DOCI.'ALIEN'I'S

VOL'Oi "I'

L'ED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

vcv

I O iid4

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-29;

50-323/94-29

AND NOTICE OF

VIOLATION

This refers to the special

inspection

conducted

by G.

W. Johnston of this

office on November

1 through

December

2,

1994, of the circumstances

associated

with MODE

1 operation of Diablo Canyon,

Unit 2, with three of four safety

injection accumulators

at less

than the minimum pressure

required

by plant

Technical Specifications.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Plant, Units

1 and 2,

facility.

At the conclusion of the inspection,

the findings were discussed

with members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified

in the enclosed

Notice of

Violation (Notice).

The first violation involved improper entry into

operating

MODEs

1,

2,

and

3 (above

1000 psig) with accumulators

2-2, 2-3,

and

2-4 below the Technical Specification

minimum pressure.

The second violation

involved two examples

where your staff failed to follow procedures

for

establishing

and verifying the boundaries

for a clearance

for your main

annunciator

system

upgrades.

The third violation involved two examples of

inadequate

procedures

for ensuring timely evaluation of out-of-tolerance

conditions prior to plant restart

and appropriate initial test conditions for

performing accumulator

pressure

instrument

channel calibrations.

9412230072

941216

PDR

ADOCK 05000275

Q

PDR

~EOI

/<

0

Pacific

Gas

and Electric Company

These violations are of concern

because

they involve

a failure of three

controls for equipment configuration

management

which resulted

in the restart

of Unit 2 with three accumulators

below the, Technical Specification

minimum

pressure.

These control failures are improper implementation of equipment

clearances,

inadequate

procedures

for surveillance testing,

and

a lack of

prompt corrective actions for nonconforming conditions,

Had any of these

three controls

been effective,

the

mode changes

with inoperable

accumulators

could have

been prevented.

You are required to respond to this letter

and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Sincerely,

A. Bill Beach,

Director

Division of Reactor Projects

Enclosure:

1.

Appendix

A - Notice of Violation

2.

Appendix

8

NRC Inspection

Report

50-275/94-29;

50-323/94-29

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston,

California

93432

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

0

Pacific

Gas

and Electric Company

Ns. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Hanaging Editor

1321

Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington, Esq.,

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Nr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Hr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

0

1

Pacific

Gas

and Electric Company

OEC

I 6 tggg

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB ( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB, HS:

A. B. Beach,

(D/DRP)

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

RIV:DRP/E*

C:DRP/E*

GWJohnston

DFKirsch

12/2/94

12/2/94

"previous y concurre

D:WCFO~

KEPerkins'f8~

12//&/94

D:DRP

Beach ~

12//&/94

l

Pacific

Gas

and Electric Company

OEC

I 6 l994

E-Mail report to D. Sullivan

(DJS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

MS:

A. B. Beach,

(D/DRP)

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

RIV:DRP/E*

C:DRP/E*

D:WCFO~

D:DRP

DFKirsch

12/2/94

GWJohnston

12/2/94

previous

'

concurre

12/gr/94

12//& /94

KEPerkinsfB~

Beach ~

ei

0