Forwards Insp Repts 50-275/94-19 & 50-323/94-19 on 941011-27.No Violations Noted
ML16342C767
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/14/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C768 List:
References
RTR-NUREG-1021 NUDOCS 9412200240
Download: ML16342C767 (12)


See also: IR 05000275/1994019

Text

PRIORIT'Y 2

REGULATORY(~KC%8$IMKIZIH'Eoi%3IRKIEKJTION SYSTEM

( RIDS )

ACCESSION NBR:9412200240

DOC.DATE: 94/12/14

NOTARIZED: NO

DOCKET

CIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERgG.M.

Pacific Gas

S Electric Co.

SUBJECT:

Forwards insp repts

50-275/94-19

& 50-323/94-19

on

941011-27.No violations noted.

DZSTRZBUTZON CODE:

ZE42D

COPZES

RECEZVED:LTR g ENCL g

SZZE:

+ I

TITLE: Operator Licensing Examination Reports

NOTES:

RECI'PIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

NRR/DRCH/HHFB

RGN4

FILE

01

EXTERNAL: NOAC

COPIES

LTTR ENCL

1

1

2

2

1

0

1

1

1

1

RECIPIENT

ID CODE/NAME

PETERSONiS

FILE-CENTER

02

NRR/DRCH/HOLB

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

YOTE TO ALL"RIDS" RECIPIEi~:.

PLEASE HELP US TO REDUCE iVASTE! COi iTACTTHEDOCL'MEiTCOYTROL

DESK, ROOM Pl -37 (EXT. 504-20S3

) TO ELIMIYATEYOUR YAMEFROM

DISTRIBI.'TIONLISTS FOR DOCUMENTS YOU DOi'1'

EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

10

ENCL

9

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

I 4

I99Cl

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT'RC

INSPECTION

REPORT 50-275/94-19;

50-323/94-19

This refers to the inspection, conducted

by Ryan Lantz,

and the personnel

identified in the enclosed

report,

on October 11-27,

1994.

The inspection

included

an assessment

of th'e qualifications of 16 individuals who had applied

for licenses

to operate

your Diablo Canyon,

Unit

1 and 2, facility.

At the

conclusion of the inspection,

findings of generic significance

were discussed

with those

members of your staff identified in the enclosed report.

Appropriate licenses

have

been

issued to 10 applicants,

who successfully

completed all portions of their examinations.

Areas-examined

during the"inspection

are identified in the report.

Within

these

areas,

the inspection consisted of evaluation of 'license applicants

by

the use of written examinations,

dynamic simulations,

selected

job related

tasks,

and oral questioning

in accordance

with NUREG-1021,

"Operator Licensing

Examiner Standards,"

Revision 7, Supplement

1.

The results of this inspection

are documented

on page

2, in the enclosed

report.

We are concerned

with the abnormally large

number of diagnostic errors

observed

during the operating examinations.

Additionally, our observations

of

control

room decorum in both units revealed

a less

formal

and attentive

operating

environment

than expected for the plant status,

based

on facility

administrative

procedures.

You are encouraged

to address

these

concerns

to

prevent

performance

degradation.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

9412200240 94i2i4

PDR

ADOCK 05000275

Q

PDR

Pacific

Gas

and Electric Company

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerel

Thomas

P.

Gwyn

,

Di ec or

Division of'e cto

Sa et

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

Appendix -

NRC Inspection

Report-

50-275/94-19;

50-323/94-19 w/Attachments

cc w/complete enclosure:

Pacific

Gas

8 Electric Co.

ATTN:

Jim Welsch

Operations

Training Supervisor

P.O.

Box 56

Avila Beach,

CA

93424

cc w/enclosure:

(except Master Examination

and Answer Key)

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston,

California

93432

San Luis Obispo

Mothers for Peace

ATTN:

Ms. Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

Pacific

Gas

and Electric Company

-3-

i

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health

Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Manager

P,O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail report to D. Sullivan

(DJS)

bcc w/enclosure:

(except Master Examination

and Answer Key)

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

R. Gallo,

NRR/HOLB

bcc w/complete enclosure:

bcc to

DMB ( IE42)

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

Branch Chief (DRP/TSS)

MNBB 4S03

B. Henderson,

WCFO,

PAO

WCFO)

DOCUMENT NAME:

R:ItDC419RP.REL

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" a Copy with enclosures "N" ~ No copy

JLPellet

RELantz

RIV:RE:OB

E

C:OB

0:DRS

TPGw nn

D:DRP

Beach

D:DRS

TPGw nn

12/5 /94

12/

/94

12/

94

OFFICIAL RECORD

COPY

12//9 /94

12/J

94

Pacific

Gas

and Electric Company

E-Mail report to D. Sullivan

(DJS)

bcc w/enclosure:

(except Master Examination

and Answer Key)

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

MNBB

R. Gallo,

NRR/HOLB

bcc w/complete enclosure:

bcc to

DMB ( IE42)

Resident

Inspector

MIS System

Senior Project

Inspector

(DRP/E,

Branch Chief (DRP/TSS)

4503

B. Henderson,

WCFO,

PAO

WCFO)

DOCUMENT NAME:

R:iDC419RP.REL

Tc receive copy ot document. indicate in bcx: "C

~ Copy without enclosures

E" ~ Copy with enclosures

N" ~ No copy

RIV:RE:OB

E

RELantz

12/5 /94

C:OB

JLPel 1 et ~

12/

/94

D:DRS

D:DRP

TPGw nn

Beach

12/

94

12//7 /94

OFFICIAL RECORD

COPY

0:DRS

TPGw nn

12/1

94