ML16342C727

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-323/94-28 on 941019-28 & Notice of Violation.Violation of Concern Because It Involves Inadvertent Securing of in-service Residual Heat Removal Pump
ML16342C727
Person / Time
Site: Diablo Canyon 
Issue date: 11/09/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C729 List:
References
NUDOCS 9411170031
Download: ML16342C727 (8)


See also: IR 05000323/1994028

Text

~

~P,R RE0I

Cp9

UNITED STAT ES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PI.AZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

Docket:

50-323

License:

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

(III

SUBJECT:

NRC

INSPECTION

REPORT 50-323/94-28

(NOTICE OF VIOLATION)

This refers to the inspection

conducted

by H. Tschiltz of this office on

October

19-28,

1994.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Plant, Unit 2-, facility.

At

the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

This

special

inspection

evaluated

the circumstances

associated

with the loss of

residual

heat

removal flow for approximately

6 minutes

on October

18,

1994.

Within these

areas,

the inspection consisted

of selective

examinations

of

procedures

and representative

records,

interviews with personnel,

and

observation of activities in progress.

The purpose of the inspection

was to

determine

whether activities authorized

by the license

were conducted

safely

and in accordance

with NRC requirements.

Based

on the results of this inspection,

certain licensed activiti,es appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation is of concern

because it involves the

inadvertent

securing of the in-service residual

heat

removal

pump which

resulted

in loss of core cooling during reactor

shutdown,

a serious

safety

concern.

We are concerned

that the cause of the violation involved two

failures

by two members of your operations staff to follow the appropriate

procedure

and that

a contributing cause of the violation was the failure to

conduct

an adequate

pretest briefing.

While we recognize your efforts to

improve procedural

compliance at Diablo Canyon,

we remain concerned

your

efforts

may not

be fully effective.

You are required to respond to this letter

and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

94iii7003i 94ii09

PDR

ADOCK 05000323

8

PDR

Pacific

Gas

and Electric Company

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedu'res

of the Office of Hanagement

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No, 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

i

8Y

'

A. Bill Beach, Director

Division of Reactor

Projects

Enclosures:

1.

Appendix A Notice of Violation

2.

Appendix

B NRC Inspection

Report

50-275/94-28'0-323/94-28

cc w/enclosures:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

PRO.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN;

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

Pacific

Gas

and Electric Company

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857

Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

0'

Pacific

Gas

and Electric Company

scv -e lsd

E-Mail report to D. Sullivan

(DJS)

bcc to

DNB (IE01) >gy

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV Fi1 e

Leah Tremper

(OC/LFDCB,

MS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

RIV:RI

MTschiltz

11/

/94

C:DRP/E

DFKirsch

11/

/94

D:W FO

KEPerkins

11/

/94

D:DRP

Beach QA

II/7 /94