Text
~
~P,R RE0I
Cp9
UNITED STAT ES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PI.AZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
Docket:
50-323
License:
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
(III
SUBJECT:
NRC
INSPECTION
REPORT 50-323/94-28
This refers to the inspection
conducted
by H. Tschiltz of this office on
October
19-28,
1994.
The inspection
included
a review of activities
authorized for your Diablo Canyon Nuclear
Power Plant, Unit 2-, facility.
At
the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
This
special
inspection
evaluated
the circumstances
associated
with the loss of
residual
heat
removal flow for approximately
6 minutes
on October
18,
1994.
Within these
areas,
the inspection consisted
of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and
observation of activities in progress.
The purpose of the inspection
was to
determine
whether activities authorized
by the license
were conducted
safely
and in accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activiti,es appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because it involves the
inadvertent
securing of the in-service residual
heat
removal
pump which
resulted
in loss of core cooling during reactor
shutdown,
a serious
safety
concern.
We are concerned
that the cause of the violation involved two
failures
by two members of your operations staff to follow the appropriate
procedure
and that
a contributing cause of the violation was the failure to
conduct
an adequate
pretest briefing.
While we recognize your efforts to
improve procedural
compliance at Diablo Canyon,
we remain concerned
your
efforts
may not
be fully effective.
You are required to respond to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
94iii7003i 94ii09
ADOCK 05000323
8
Pacific
Gas
and Electric Company
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedu'res
of the Office of Hanagement
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No, 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
i
8Y
'
A. Bill Beach, Director
Division of Reactor
Projects
Enclosures:
1.
Appendix A Notice of Violation
2.
Appendix
B NRC Inspection
Report
50-275/94-28'0-323/94-28
cc w/enclosures:
Sierra
Club California
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715 Rocky Canyon
Creston,
93432
San Luis Obispo
Hothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Hs. Jacquelyn
C. Wheeler
PRO.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN;
Hanaging Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
Pacific
Gas
and Electric Company
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
John
Townsend,
Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
0'
Pacific
Gas
and Electric Company
scv -e lsd
E-Mail report to D. Sullivan
(DJS)
bcc to
DNB (IE01) >gy
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV Fi1 e
Leah Tremper
(OC/LFDCB,
MS:
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RIV:RI
11/
/94
C:DRP/E
DFKirsch
11/
/94
D:W FO
KEPerkins
11/
/94
D:DRP
Beach QA
II/7 /94