October 28, 1994 Hr. Gregory M. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P. 0.
Box 770000 San Francisco, California 94106
SUBJECT:
RESPONSE
TO NRC BULLETIN 90-01, SUPPLEMENT 1, "LOSS OF FILL OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT" DIABLO CANYON POWER PLANT, UNIT 1
(TAC NO. H85381)
AND UNIT 2 (TAC NO. H85382)
Dear Hr. Rueger:
By letters dated March 8, and December 10,
- 1993, you provided a response to
'RC Bulletin 90-01, Supplement 1, for Diablo Canyon Power Plant (DCPP), Unit Nos.
1 and 2.
Your responses stated that you would fulfillthe requested actions as outlined in the Supplement and you identified how you currently meet or will meet the requirements of each requested action.
The enclosed Safety Evaluation Report (Enclosure
- 1) documents our review and concurrence with the contractor's finding presented in Technical Evaluation
- Report, EGG-DNSP-10826 (Enclosure 2),
and finds the licensee's response to this item to be acceptable.
This completes the NRC staff's activities associated with TAC Nos.
H85381 and H85382.
Further NRC review, if any, will be performed by inspection or audit.
Sincerely ORIGINAL SIGNED BY:
Sheri R. Peterson, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos.
50-275 and 50-323
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report cc w/encls:
See next page
~ I-STR-IBUT-IO Docket F'ublic PDIV-2 Reading JRoe TQuay DFoster-Curseen SPeterson ACRS (10)
- KPerkins, WCFO NLe DSpaulding Document Name:
DC85381.SE OFC DRPWiLA PDIV-2QP NAME DFoster-Cu seen SPeter o :ye DATE 10/
V/94 10/g/94 OFFICIAL RECORD COPY 04UI. SV 94ii070390 941028 PDR ADOCK 05000275 PDR
C
)
a )
0 4
ggR RE00 P0 Cy O
Ig 0 ++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 1994 Mr. Gregory M. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P. 0.
Box 770000 San Francisco, California 94106
SUBJECT:
RESPONSE
TO NRC BULLETIN 90-01, SUPPLEMENT 1, "LOSS OF FILL OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT" DIABLO CANYON POWER PLANT, UNIT 1 (TAC NO. M85381)
AND UNIT 2 (TAC NO. M85382)
Dear Mr. Rueger:
By letters dated March 8, and December 10,
- 1993, you provided a response to NRC Bulletin 90-01, Supplement 1, for Diablo Canyon Power Plant (DCPP), Unit Nos.
1 and 2.
Your responses stated that you would fulfillthe requested actions as outlined in the Supplement and you identified how you currently meet or will meet the requirements of each requested action.
The enclosed Safety Evaluation Report (Enclosure
- 1) documents our review and concurrence with the contractor's finding presented in Technical Evaluation
- Report, EGG-DNSP-10826 (Enclosure 2),
and finds the licensee's response to this item to be acceptable.
This completes the NRC staff's activities associated with TAC Nos.
H85381 and M85382.
Further NRC review, if any, will be performed by inspection or audit.
Sincerely Docket Nos.
50-275 and 50-323 Sheri R. Peterson, Project Hanager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report cc w/encls:
See next page
Mr. Gregory M. Rueger Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon California 93432 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P. 0.
Box 164 Pismo Beach, California 93448 Managing Editor The Count Tele ram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Creston, Harris Tower 5 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Christopher J. Warner, Esq.
Pacific Gas 5, Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Townsend Vice President and Plant Manager Diablo Canyon Power Plant P. 0.
Box 56 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940
C