ML16342C697

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/94-23 & 50-323/94-23 on 940912-16.No Violations Noted
ML16342C697
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/07/1994
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C698 List:
References
NUDOCS 9410180020
Download: ML16342C697 (10)


See also: IR 05000275/1994023

Text

1P,R REG(j(

~C+

"Ip

C

0

Cy

. p%~

P

I

1

0

1

0

Cy

+0

Wp*~4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON, TEXAS 76011 8064

Og -7 l9M

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

Cali fornia

94177

SUBJECT:

NRC INSPECTION

REPORT 50-275/94-23;

50-323/94-23

This refers to the inspection

conducted. by Mr. L. T. Ricketson of this office

on September

12-16,

1994.

The inspection

included

a review of activities

authorized for your Diablo Canyon Nuclear

Power Plant, Units

1 and 2,

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosure:

Appendix NRC Inspection

Report

50-275/94-23;

50-323/94-23

9410180020

941007

PDR

ADOCK 05000275

8

PDR

Samuel

J. Collins, Direc or

Division of Radiation Safety

and Safeguards

~.of

JP ((

Pacific Gas

and Electric Company

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard Ferguson

Energy Chair

6715 Rocky Canyon

Creston, California

93432

San Luis Obispo

brothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo Beach, California

93448

Ns. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach, California

93448

The County Telegram Tribune

ATTN:

managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Nr. Truman Burns)Nr. Robert Kinosian

505 Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

monterey, California

93940

Radiologic Health Branch

State Department of Health Services

ATTN:

Hr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

Pacific Gas

and Electric Company

State of California

ATTN:

Hr. Peter

H. Kaufman

Deputy Attorney General

110 Mest

A Street,

Suite 700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J. Marner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John Townsend,

Vice President

and Plant Hanager

P.O.

Box 56

Avila Beach, California

93424

Paci fic Gas

and Electric Company

-4-

E-Nail report to D. Sullivan (DJS)

bcc to DNB (IE06)

bcc distrib.

by RIV:

L. D. Callan

DRSS-FIPB

(Hodges)

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

NS:

B. Nurray,

DRSS/FIPB

Diablo Canyon Resident

Inspector

NIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

NNBB 4503

L. T. Ricketson,

DRSS/FIPB

RIV:FIPB

C:FIPB

LTRicketson: nh

BNurray

DD:DRSS

RAScara

D:

P

AB e

D:DRSS

SJColli

/

94

~/

/94

Ogl gs4

8 /1 /94

/

/94

0

Pacific Gas

and Electric Company

-4-

E-Nail report to D. Sullivan (DJS)

bcc to

DNB (IE06)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

(Hodges)

Branch Chief (DRP/E,

MCFO)

RIV Fi1 e

Leah Tremper,

OC/LFDCB,

HS:

B. Hurray,

DRSS/FIPB

Diablo Canyon Resident

Inspector

NIS System

Senior Project Inspector

(DRP/E,

MCFO)

Branch Chief (DRP/TSS)

HNBB 4503

L. T. Ricketson,

DRSS/FIPB

RIV:FIPB

LTRicketson: nh

/

94

C: FIPB

BNurray

DD:DRSS

RAScara

ail yes

D:

P

AB e

8 /1 /94

D:DRSS

SJColli

/ 7/94