Forwards Insp Repts 50-275/94-22 & 50-323/94-22 on 940724- 0831.Two non-cited Violations Noted
ML16342C682
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/21/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C683 List:
References
NUDOCS 9410030010
Download: ML16342C682 (10)


See also: IR 05000275/1994022

Text

~P,R RE00

fp0cn

. 1Q

0>>*<<v

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-6064

e

~f=p 2l rm

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77- Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-22;

50-323/94-22

This refers to the inspection

conducted

by M. Hiller and

H. Tschiltz of this

office,

on July 24 through August 31,

1994.

The inspection

included

a

review'f

activities authorized for your Diablo Canyon Nuclear

Power Plant,

Units

1

and 2, 'facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report,.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

in the

enclosed

reports

Some instances

of inadequate

and incomplete engineering

technical

work were

identified during this inspection period.

We also note that, for some v'alid

engineering

problems identified by Nuclear gual.ity Services,

some engineering

staff disputed

the significance or validity of the issue

and did not

demonstrate

a self-critical behavior.

We encourage

you to promote

a more

self-critical approach

among your engineering staff to improve engineering

products

and support.

We have observed

a significant increase

in the effectiveness

of the quality

oversight organizations.

This is to be

commended

and further encouraged,

since their findings have

been probing

and insightful

and contributed to the

effectiveness

of your activities

and plant safety,

Two noncited violations were identified, involving failure to properly

implement troubleshooting

on steam. generator

instruII.I niation,

and failure to

implement reporting requirements

when emergency diesel

generators

(EDGs)

9410030010

940921

PDR

ADOCK 05000275

6

PDR

'C)

~

Pacific

Gas

and Electric Company

started

as

a result of startup transformer undervoltage.

These violations are

not being cited because

the criteria of Section VII.B(2) of the

NRC

Enforcement Policy was satisfied.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you,

Sincerely,

Enclosure:

Appendix -

NRC Inspection

Report

50-275/94-22;

50-323/94-22

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715 Rocky Canyon

Creston,

California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach, California

93448

The County Telegram Tribune

ATTN:

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

A. Bil

Beach, Director

Division of Reactor Projects

0

Pacific-Gas

and Electric Company

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns(Mr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

- Diablo Canyon

Independent

Safety

Committee

Attn:

Robert

R. Wellington;

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health

Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

John

Townse'nd,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific Gas

and Electric Company

SEP 2

I

1994

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

HS:

A. B. Beach,

D/DRP

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

V:SRI:DRP/E

C:DRP/E +

D:WCFO

D:DRP

Hiller;jP

09/ 4 /94

Kirsc~

09/Q /94

EPerkins4

09/2f /94

@Beach W

09/ g /94

4 1%a.1~ wnH 6 Jemolhaf, Wc,a B/u(qq

0

~

,

Pacific

Gas

and Electric Company

SEP 2 I

1994

E-Mail report to D. Sullivan '(DJS)

bcc to

BNB (IE01) ygl

bcc distrib.

by RIV:

L. J. Callan

Resident

Inspector

DRSS-F IPB

MIS System

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper,

OC/LFDCB,

MS:

MNBB 4503

A. B. Beach,

D/DRP

V:SRI:DRP/E

C DRP/E +

D:WCFO

D:DRP

Niller;jP

09/ 0 /94

Kirsc~

09/ Q /94

EPerkins@

09/Zf /94

@Beach

09/

I 34

4 ltL1~ Wt% 6 JbNajy~, gC~ qi~(qq