Text
~P,R RE00
fp0cn
. 1Q
0>>*<<v
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-6064
e
~f=p 2l rm
Dockets:
50-275
50-323
Licenses:
DPR-82
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77- Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/94-22;
50-323/94-22
This refers to the inspection
conducted
by M. Hiller and
H. Tschiltz of this
office,
on July 24 through August 31,
1994.
The inspection
included
a
review'f
activities authorized for your Diablo Canyon Nuclear
Power Plant,
Units
1
and 2, 'facility.
At the conclusion of the inspection,
the findings were
discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report,.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
in the
enclosed
reports
Some instances
of inadequate
and incomplete engineering
technical
work were
identified during this inspection period.
We also note that, for some v'alid
engineering
problems identified by Nuclear gual.ity Services,
some engineering
staff disputed
the significance or validity of the issue
and did not
demonstrate
a self-critical behavior.
We encourage
you to promote
a more
self-critical approach
among your engineering staff to improve engineering
products
and support.
We have observed
a significant increase
in the effectiveness
of the quality
oversight organizations.
This is to be
commended
and further encouraged,
since their findings have
been probing
and insightful
and contributed to the
effectiveness
of your activities
and plant safety,
Two noncited violations were identified, involving failure to properly
implement troubleshooting
on steam. generator
instruII.I niation,
and failure to
implement reporting requirements
when emergency diesel
generators
(EDGs)
9410030010
940921
ADOCK 05000275
6
'C)
~
Pacific
Gas
and Electric Company
started
as
a result of startup transformer undervoltage.
These violations are
not being cited because
the criteria of Section VII.B(2) of the
NRC
Enforcement Policy was satisfied.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you,
Sincerely,
Enclosure:
Appendix -
NRC Inspection
Report
50-275/94-22;
50-323/94-22
cc w/enclosure:
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715 Rocky Canyon
Creston,
93432
San Luis Obispo
Hothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Hs. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo Beach, California
93448
The County Telegram Tribune
ATTN:
Hanaging Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
A. Bil
Beach, Director
Division of Reactor Projects
0
Pacific-Gas
and Electric Company
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns(Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
- Diablo Canyon
Independent
Safety
Committee
Attn:
Robert
R. Wellington;
Esq.
Legal
Counsel
857 Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health
Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
John
Townse'nd,
Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific Gas
and Electric Company
SEP 2
I
1994
E-Hail report to D. Sullivan
(DJS)
bcc to
DMB (IEOI)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
HS:
A. B. Beach,
D/DRP
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
V:SRI:DRP/E
C:DRP/E +
D:WCFO
D:DRP
Hiller;jP
09/ 4 /94
Kirsc~
09/Q /94
EPerkins4
09/2f /94
@Beach W
09/ g /94
4 1%a.1~ wnH 6 Jemolhaf, Wc,a B/u(qq
0
~
,
Pacific
Gas
and Electric Company
SEP 2 I
1994
E-Mail report to D. Sullivan '(DJS)
bcc to
BNB (IE01) ygl
bcc distrib.
by RIV:
L. J. Callan
Resident
Inspector
DRSS-F IPB
MIS System
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper,
OC/LFDCB,
MS:
MNBB 4503
A. B. Beach,
D/DRP
V:SRI:DRP/E
C DRP/E +
D:WCFO
D:DRP
Niller;jP
09/ 0 /94
Kirsc~
09/ Q /94
EPerkins@
09/Zf /94
@Beach
09/
I 34
4 ltL1~ Wt% 6 JbNajy~, gC~ qi~(qq
0