Forwards Insp Repts 50-275/94-18 & 50-323/94-18 on 940605- 0723 & Notice of Violation
ML16342C648
Person / Time
Site: Diablo Canyon  
Issue date: 08/15/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C649 List:
References
EA-94-157, NUDOCS 9408220058
Download: ML16342C648 (14)


See also: IR 05000275/1994018

Text

PRIDRIT'Y 2

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9408220058

DOC.DATE: 94/08/15

NOTARIZED:

NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

BEACHiA.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERiG.M.

Pacific Gas

6 Electric Co.

SUBJECT:

Forwards

insp repts

50-275/94-18

& 50-323/94-18

on 940605-

0723

a notice of violation.

R

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR J

ENCLl SIZE:

(D

1

IP

I

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

r

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

REG ~F2-'bE

02

RGN4

FILE

01

TERNAL: EG!NG/BRYCE,J. H.

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PETERSONPS

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NUDOCS-ABSTRACT

OGC/HDS3

RES/HFB

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

u

NOTE TOALL "RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL

DESK," ROOM P! -37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM

DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

21

ENCL

21

~

'

~p,P AE0(

Wp0

C

'~)

S

t

4 p*g 4

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

EA:

94-157

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

AUG

I 5 lggn

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power

Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/94-18;

50-323/94-18

(NOTICE OF

VIOLATION)

~ This refers to the inspection

conducted

by M. Hiller, and the inspectors

identified in the enclosed

report, of this office on June

5 through July 23,

1994.

The inspection

included

a review of activities authorized for your

Diablo Canyon Nuclear

Power Plant,

Units

1 and 2, facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your

staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

This violation is of concern

because it involves

a

surveillance test procedure

which was deficient in that it failed to

accomplish

the inservice testing required

by Technical Specifications

during

cold shutdown periods.

As a result, during the last cold shutdown for Unit 2,

four residual

heat

removal

check valves

were not properly tested

in accordance

with Section

XI of the

ASHE Code.

Based

on technical

evaluation,

NRC

Enforcement Discretion

was obtained

and subsequent

temporary relief from

testing granted until the next Unit 2 cold shutdown or scheduled

refueling

outage.

A noncited violation was also noted involving the failure of a surveillance

procedure to preclude

exceeding

the sampling periodicity described

in the

Technical Specifications for measuring

the effectiveness

of the auxiliary

building ventilation system charcoal

absorber

bed.

Since the criteria of the

NRC Enforcement

Policy were satisfied,

this violation was not cited.

9408220058

940815

PDR

ADOCK 05000275

Q

PDR

Pacific

Gas

and Electric Company

An, additional

noncited violation was noted involving inadequacy

in planning

and performance of an Instrumentation

and Controls surveillance.

The

18C

technician omitted

a step in

a procedure

and, therefore,

failed to remove

an

instrument

from service prior to inserting

a test signal into the control

circuitry.

At a later point in the procedure,

the technician

questioned

the

testing but did not associate

his question with the previously omitted step.

This resulted

in

a test signal

being improperly inserted into control

circuitry, resulting in an undesired

change

in steam generator level.

We are concerned

that two of the events

noted

above involved deficient,

procedures,

which resulted

in failure to comply with Technical Specification

requirements.

Your continuing attention to procedure

adequacy

and

implementation is warranted.

Although

10 CFR 2.201 provides for a written statement

of explanation

to this

office within 20 days of your receipt of this Notice,

we note that this

violation had

been corrected

and those actions,

including your root cause

analysis,

were reviewed during this inspection.

Therefore,

no response

with

respect

to this matter is required.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

J~A'. Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A Notice of Violation

2.

Appendix

B

NRC Inspection

Report

50-275/94-18;

50-323/94-18

cc w/enclosures:

Sierra

Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston,

California

93432

0

Pacific

Gas

and Electric Company

San Luis Obispo

Mothers for Peace

ATTN:

Hs.

Nancy Culver

PION

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321

Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns5Hr.

Robert Kinosian

505

Van Ness,

Rm.

4102

.

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Hr. Steve

Hsu

P.O.'Box 942732

Sacramento,

California

94234

State of California

ATTN:

Hr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

0'

Pacific Gas

and Electric Company

Pacific Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San francisco, California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

'John

Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

0

Pacific Gas

and Electric Company

'

AUG l5

ISBN

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (I EOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

HS:

, A. B. Beach,

D/DRP

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

MHHiller*

DFKirsch*

RIV:SRI: DRP/E

C: DRP/E

D:WCFO

KEPerkins*

D:DRP

ABBeach

8/

/94

8/

/94

  • revious y concurre

8/

/94

8//5/94

0'

Pacific

Gas

and Electric Company

AUG

I 5 Iggg

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV Fi1 e

Leah Tremper,

OC/LFDCB, HS:

A. B. Beach,

D/DRP

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

RIV:SRI: DRP/E

HHHiller*

8/

/94

C:DRP/E

DFKirsch*

8/

/94

D WCFO

KEPerkins*

8/

/94

D:DRP

ABBeach 9%

8//5/94

  • revious y concurre